INSTALLATION
As a first step, proceed with the following drawings:
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the hood
is
to be fitted.
A horizontal line
A
at
790
–
89
0
mm above the cooker top.
A horizontal line
B
at a
X
mm above the horizontal line
A
.
A horizontal line
C
at a
115
mm below the horizontal line
A
.
Mark Points:
Mark a point
(1)
on the horizontal line
A
,
80
mm to the vertical reference line.
Repeat this operation on the other side , checking that the
two
marks are leveled.
Mark a point
(2)
on the horizontal line
B
,
60
mm to the vertical reference line.
Repeat this operation on the other side, checking that the two marks are on the same
horizontal line.
Mark a point
(3)
on the horizontal line
C
,
1
5
0
mm to the vertical reference line
.
Repeat
this operation on the other side , checking that the two marks are leveled.
Fix the brackets :
Drill holes at the marked points with a ɸ10 mm drill bit.
Insert the Wall Plugs 11 into the holes.
Fix a Chimney fixing bracket
21
with 2 screws
10
(5 x 50) at the horizontal line
B
.
WALL DRILLING AND BRACKET FIXING
1
5
0
1
5
0
C
(3)
Option Chimney
X
1
400X390
305
-
650
2
500X490
405
-
85
0
Vertical reference line
115
2
3
4
6
7
8
9
10
11
790-890
Screw 2 screws
10
(5 x 50) to Wall Plugs
11
at the horizontal line
A
;
approximately
the four fifth
length of the screws
10
(5 x 50) was screwed into the Wall Plugs
11
,
used for hook the hood.
5