C-12 CRUSHER
TRACKING (MOVING) PROCEDURE
When engine is running at speed No.1, the machine can be moved to desired position on site by
following the instructions below:-
Main conveyor in raised position
2:- Press button "Interlock On"
3:- Press button "Main conveyor lift"
4a:- Activate levers to raise front jacking legs
4b:- Activate levers to raise rear jacking legs
1:- Press button "Clamp On".
13