background image

 

 

 

                           ipe-2200ax-T and ipe-2200ax-F – Installation in a Rack 

 

www.extremenetworks.com

 |  4

 

Installing the Outer Rails onto the Rack 

Each end of the assembled outer rail includes a bracket with square pegs to fit into your rack holes. 
If you have an older rack with round holes, these brackets must be removed, and you must use 
screws to secure the rail to the rack. 

1. 

Align the square pegs on the front end of the rail with the square holes on the front of the rack 
(C). Push the rail into the rack until the quick release bracket snaps into place, securing the rail 
to the rack. Keep the rail horizontal. 

2. 

Adjust the rail to reach the full depth of your rack. 

3. 

Align the square pegs on the rear end of the rail to the holes on the rack (D) and push the rail 
into the rack until the quick release bracket snaps into place, securing the rail to the rack. 

4. 

Repeat the procedure for the other outer rail assembly. 

 

Note

: the figure above is for illustrative purposes only. Always install servers at the bottom of the 

rack first. 

Sliding the appliance onto the Rack Rails 

1. 

Align the chassis rails with the front of the rack rails. 

2. 

Slide the chassis rails into the rack rails, keeping the pressure even on both sides. The spring 
latch engages when the chassis is part way in. Push the appliance completely into the rack. 

3. 

Insert and tighten the thumbscrews that hold the front of the appliance to the rack. 

 

Summary of Contents for ipe-2200ax-T

Page 1: ...you begin the installation procedure outlined in the sections that follow Choosing a Setup Location Leave enough clearance in front of the rack to enable you to open the front door completely 60 cm 25 inches Leave approximately 75 cm 30 inches of clearance in the back of the rack to allow for sufficient airflow and ease in servicing This product is for installation only in a Restricted Access Loca...

Page 2: ...on is not compromised Mechanical Loading Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading Circuit Overloading Consideration should be given to the connection of the appliance to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring Appropri...

Page 3: ...ed before mounting onto the rack 1 Identify the left and right outer rails by examining the ends which bend outward Match the left front outer rail with the left rear outer rail and the same for the right rails 2 Align the round post in the rear rail B with the round hole at the end of the slot in the front rail A and slide the front section into the rear section ...

Page 4: ...2 Adjust the rail to reach the full depth of your rack 3 Align the square pegs on the rear end of the rail to the holes on the rack D and push the rail into the rack until the quick release bracket snaps into place securing the rail to the rack 4 Repeat the procedure for the other outer rail assembly Note the figure above is for illustrative purposes only Always install servers at the bottom of th...

Page 5: ...k www extremenetworks com 5 Note the figure above is for illustrative purposes only Always install servers at the bottom of the rack first Warning do not pick up the appliance with the front handles They are designed to pull the system from a rack only ...

Page 6: ... without notice Trademarks Extreme Networks and the Extreme Networks logo are trademarks or registered trademarks of Extreme Networks Inc in the United States and or other countries All other names including any product names mentioned in this document are the property of their respective owners and may be trademarks or registered trademarks of their respective companies owners For additional info...

Reviews: