S
UMMIT
V
IRTUAL
C
HASSIS
D
ESIGN
AND
I
NSTALLATION
G
UIDE
7
S
UMMIT
V
IRTUAL
C
HASSIS
R
EAR
V
IEW
S
UMMIT
V
IRTUAL
C
HASSIS
R
EAR
V
IEW
Figure 4 shows the rear panel view of the Summit Virtual Chassis.
Figure 4: Summit Virtual Chassis rear panel
P
OWER
S
OCKETS
The Summit Virtual Chassis has two power sockets. The upper power socket provides
power to one of the internal Summit Virtual Chassis power supplies. It also provides
redundant load-shared power to the Summit switch connected to the Summit Virtual
Chassis using RPS port A.
SummitLink Port Status LEDs
Link
Green
Yellow
Off
Link is present.
Link error.
No link, or either the Summit Virtual Chassis or the Summit
switch attached to this port is powered off.
TX Activity
Yellow
Off
Frames are being transmitted on this port.
No transmit activity detected on this port.
RX Activity
Yellow
Off
Frames are being received on this port.
No receive activity detected on this port.
Table 1: Summit Virtual Chassis LEDs (continued)
Unit Status
LEDs
Color
Indicates
RPS port A
Power socket A
RPS port B
Power socket B
virtchas.book Page 7 Friday, May 29, 1998 10:08 AM