background image

PS 123  12 VDC, 3 Amp Power Supply • User's Guide

PS 23, cont’d

PS 123  12 VDC, 3 Amp Power Supply • User's Guide

 

4

Ensure that the cables exit the end of the pipe and not the 

cable access hole.

5

Remove any rubber feet from the bottom of the device(s) to 

be mounted.

6

Secure the device(s) to the bottom plate with the provided 

screws.

7

Slide the top plate up the pipe until the pipe collar is 

positioned just below the cable access hole.  Tighten the 

set screws until they just grip the pipe.  At least three set 

screws must come in contact with the pipe.

8

Ensure that the front of the top plate is facing toward the 

projector screen.  This may require turning the pipe with a 

wrench.  When the top plate is level and correctly oriented, 

secure it by fully tightening the set screws.

 

FRONT

REAR

Cable Input from
Ceiling (AV control)

Cable Access
Hole

Bottom Plate

Filler Plate

Cable Output
 to Projector

CO

M 1

LA

N

UID

# 0

930

120

52

PO

WE

R

12V

     

    

.5A

 MA

X

CO

M1

TX

RX

TX

RX

CO

M2

CO

M 2

RE

D-O

VE

RL

OA

D

P/S

 12

3

12 V

DC

 3A

 PO

WE

R S

UPP

LY

 

Figure 13 — Routing the cables for the PMK 450

 

9

Reroute the cables so that they exit the pipe through the 

cable access hole.  

10

.  Connect the cables to the device(s.)  Pull excess cable back 

into the ceiling.  

11

.  Feed the device(s) output cables to the projector through 

the cable access hole and out through the bottom of the 

pipe.

12

.  Once all cables are routed, insert the lugs on the bottom 

plate into the slots on the top plate and slide the bottom 

plate into position.

 

Lugs (4)

Slots (4)

Figure 14 — Attaching PMK 450 bottom plate to the 
top plate

 

13

.  Lock the top and bottom plates together with the security 

screws and reattach the front and rear plates.

Summary of Contents for PS 123

Page 1: ...Amersfoort The Netherlands 800 3987 6673 31 33 453 4040 FAX 31 33 453 4050 Extron Electronics Asia 135 Joo Seng Rd 04 01 PM Industrial Bldg Singapore 368363 800 7339 8766 65 6383 4400 FAX 65 6383 4664...

Page 2: ...den Stromunterbrechung Um das Ger t auf sichere Weise vom Netz zu trennen sollten Sie alle Netzkabel aus der R ckseite des Ger tes aus der externen Stomversorgung falls dies m glich ist oder aus der W...

Page 3: ...s equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful interference to radio communications Operati...

Page 4: ...it Adapter Kit 3 UL requirements 4 Installing the flexible conduit cable 4 Output power wiring the DC output connectors 7 Mounting options 8 Rack mounting 8 UL rack mounting requirements 8 Rack mounti...

Page 5: ...peration green and overload operation red The rack mountable PS 123 has a 1U high quarter rack wide 8 5 deep metal enclosure allowing the PS 123 to take advantage of a variety of mounting options Fron...

Page 6: ...he PS 123 meets the UL 2043 requirements Figure 2 Using the conduit option for the PS 123 Outputs d DC Output connectors Connect the power cables from the devices that will receive power from the PS 1...

Page 7: ...e conduit cable assembly to the PS 123 as follows 1 Unplug the IEC power cord 2 Remove and retain the two Phillips head screws that secure the EMT plate figure 3 below to the PS 123 rear panel OUTPUTS...

Page 8: ...step 10 figure 6 above to ensure that it firmly secures the conduit EMT adapter plate to the power supply 15 Use the six screws you removed in step 3 to secure the top cover of the PS 123 back onto i...

Page 9: ...t temperature of the rack environment may be greater than room ambient temperature Therefore consider installing the equipment in an environment compatible with the maximum ambient temperature Tma spe...

Page 10: ...5 Align the mounting screws with the slots in the brackets and place the power supply against the surface with the screws through the bracket slots 6 Slide the unit slightly forward or back then tigh...

Page 11: ...lose to the ceiling as desired 8 Secure the L shaped bracket to the U bolt using the included hex nuts washers and lock washers Tighten the hex nuts securely C Be sure to tighten the hex nuts securely...

Page 12: ...d secure it by fully tightening the set screws FRONT REAR Cable Input from Ceiling AV control Cable Access Hole Bottom Plate Filler Plate Cable Output to Projector COM 1 LAN UID 093 012 052 POW ER 12V...

Page 13: ...n all outputs 42 watts Power output 12 VDC 3 A maximum total current of the 8 outputs N Maximum output current is rated at an ambient temperature of 40 C It decreases to 2 A at an ambient temperature...

Page 14: ...PS 123 12 VDC 3 Amp Power Supply User s Guide PS 123 cont d 18 PS 123 12 VDC 3 Amp Power Supply User s Guide 19 This page was intentionally left blank This page was intentionally left blank...

Page 15: ...PS 123 12 VDC 3 Amp Power Supply User s Guide PS 123 cont d 20 This page was intentionally left blank...

Reviews: