Operating Manual
12
3.2.6 Installation with automatic PE-neutral switching
In certain applications, it is desirable to keep the neutral upstream and downstream
of the UPS separated (C) while re-establishing the earthing system (TN-S, TT or
TNC-S) in the absence of voltage at the input. This can be programmed by the
configuration via the control panel. This modification must be carried out possessing
technical knowledge, at the responsibility of the installer and in conformity with the
applicable regulations and standards.
3.2.7 Connecting the cables
IMPORTANT!
All cables should be connected to the iUPS101 via the correct
cable gland and fitted by a competent person.
IMPORTANT!
Changes in the design and modifications to the equipment are not
permitted. If any changes are performed on the enclosure the
ATEX certification will become void.
Important
The installer MUST ensure that all cables have adequate
mechanical protection to avoid damage to the wires.
IMPORTANT!
Users must read the Installation and maintenance instructions
supplied for the iSTB Enclosure assembly before terminating any
cables. (Included in Chapter 10 for reference)
Remove the cover from the Ex ‘e’ Terminal box and fit the cables in the correct
positions shown below for your product:
Summary of Contents for iUPS101
Page 1: ...Installation Operating Manual iUPS101...
Page 55: ...Operating Manual 55...
Page 59: ...Operating Manual 59 11 5System Assembly Details...
Page 62: ...Operating Manual 62 14 Certification 14 1Atex Label...
Page 63: ...Operating Manual 63 14 2Atex Certificate...
Page 64: ...Operating Manual 64...
Page 65: ...Operating Manual 65...
Page 66: ...Operating Manual 66...
Page 67: ...Operating Manual 67...
Page 68: ...Operating Manual 68 14 3iUPS101 EC Declaration of Conformity...
Page 69: ...Operating Manual 69 14 4UPS System EC Declaration of Conformity...