PATHWAY HD Code Compliant Modular Access System Installation Manual
Page 45 of 92
5.4.12.
Measure the gap between the 1-1/2” square x 42-7/16” long closure post and the
platform angle post (FIG. 5.16).
5.4.13.
Locate the 1-1/2” diameter round tube and cut to the length measured in the
previous step, less 1/8” to account for the threaded inserts which will be installed
after cutting.
5.4.14.
Using a metal file, remove any sharp edges left from cutting.
5.4.15.
Place 5/16”-18 round threaded inserts into both ends of the 1-1/2” diameter round
tube (FIG. 5.16).
Use a rubber mallet or similar tool to fully seat as needed.
5.4.16.
Attach 1-1/2” diameter round tube to platform angle post
using a 5/16″
-
18 x 1″ hex
bolt through a 5/16” flat washer and into the 5/16”-18 round threaded insert
installed in the tube.
5.4.17.
Attach the other end of the tube to the closure post using a 5/16″
-18 x 2-
1/4″ long
hex bolt through a 5/16” flat washer, the uppermost hole in the closure post and,
into the 5/16”-18 round threaded insert (FIG. 5.16).
5.4.18.
Insert a square tube plug and fully seat into the top of the closure post. Use a rubber
mallet or similar tool to fully seat as needed. If necessary, use construction adhesive
to bond the plug in place.
5.4.19.
Tighten all fasteners securely.
FIG. 5.16