PATHWAY HD Code Compliant Modular Access System Installation Manual
Page 48 of 92
5.6.
TWO-LINE RAIL TURN BACK CLOSURE
There are four closures available for filling the space between two ramps in a turn back
configuration: Two-line rail for a 5’ platform side, picketed guard for a 5’ platform side, two-line
rail for a 6’ platform side, and picketed guard for a 6’ platform side. Turn back closures for a 7’
platform side are uncommon and must be ordered as a custom closure.
5.6.1.
First, install corner pocket covers in the two platform corner pockets between the
ramps which do not have platform angle posts.
5.6.1.1.
Make sure the 1-1/2” support legs and platform connector stub tubes
are flush or slightly below the tops of the platform corner pockets, and
then drop the angles on the underside of the corner pocket covers into
the pockets where the post would normally be installed (FIG. 5.20).
5.6.2.
Tighten the set screws in the corner pocket to hold the covers in place (refer back to
FIG. 2.9 for additional details on set screw locations).
FIG. 5.20