Chapter 2
Unpacking and Installing the Switch
2 - 4
Unpacking the Switch
The ARX-2000 is shipped in a single box with all components installed.
Note
The switch weighs approximately 40 lb. (18.14 Kg) without packing
materials.
After unpacking, retain all packing materials. Product returns are acceptable
only in the original packaging or in packaging obtained from F5 Networks.
Apply the following unpacking instructions:
1. Inspect the box for any shipping damage.
2. Open the box (top flaps) and remove the Accessory Kit. To verify
the contents of the Accessory Kit, see
Installing the ARX-2000, on
page 2-4
.
3. Check the shock watch sticker on the inside of the packaging.
The shock watch sticker is an orange sticker that alerts you to the
possibility of damage from some physical shock (such as a drop). If
the indicator is red, inspect the shipment for damage and notify F5
immediately.
If you need to return a component, consult the instructions, The F5
Return Materials Authorization (RMA) Process, located on the
AskF5 web site:
http://www.f5.com/pdf/customer
‐
support/rma
‐
process.pdf
4. Carefully lift the rack-mount rails, accessory tray, and chassis out of
the box.
5. Read the instructions,
Rail Kit Installation
. These instructions are
critical to understanding how to install the rails in the rack and set
the component into the rails.
These instructions are also included in this guide; see
Installing the
Rail Kit, on page B-3
.
Installing the ARX-2000
The procedure in this section includes attaching the ear assemblies. You can
attach the ear assemblies at any time. Subsequent sections cover attaching
the power cords and powering on the switch as well as attaching the front
bezel and cabling the client/server ports.
Summary of Contents for ARX-2000
Page 1: ...ARX 2000 Hardware Installation Guide 810 0062 00 ...
Page 2: ......
Page 6: ...vi ...
Page 7: ...Table of Contents ...
Page 8: ......
Page 11: ......
Page 12: ...Table of Contents xii ...
Page 14: ......
Page 22: ......
Page 28: ...Chapter 2 Unpacking and Installing the Switch 2 8 ...
Page 30: ......
Page 48: ...Chapter 3 Connecting the Switch to the Network 3 20 ...
Page 49: ...4 Maintenance Powering Down the ARX 2000 LED Indicators POST Diagnostics ...
Page 50: ......
Page 60: ......
Page 72: ...Appendix A Removing and Replacing FRUs A 14 ...
Page 73: ...B Installing the Rail Kit Installing the Rail Kit ...
Page 74: ......
Page 76: ...Appendix B Installing the Rail Kit B 4 ...
Page 77: ...Index ...
Page 78: ......
Page 80: ...Index Index 4 ...