Chapter 4
Maintenance
4 - 8
POST Diagnostics
When the switch reboots and the system powers up, POST (power-on
self-test) diagnostics run automatically to verify basic hardware integrity.
You can view any hardware failures at the system console through the
show
version
or
show chassis
commands. See the following example output for
the
show version
command.
prtlndA#
show
version
Copyright
(c)
2002
‐
2012
by
F5
Networks,
Inc.
All
rights
reserved.
Running
Release
test2.rel
:
Version
6.02.000.14365
(May
2
2012
20:08:52)
[nbuilds]
Armed
Release
test2.rel
:
Version
6.02.000.14365
(May
2
2012
20:08:52)
[nbuilds]
Backup
Release
test1.rel
:
Version
6.02.000.14364
(May
2
2012
16:53:14)
[bmccann]
System
Configuration:
Version
602000.33
prtlndA
uptime
is
2
weeks,
0
days,
2
hours,
25
minutes.
Slot
Admin
ModuleType
ModuleState
FW
Upgrade
‐‐‐‐ ‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐
1
Enabled
ACM
Online
Disabled
Resource
State
Forwarding
‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐
Switch
Up
Disabled
See the following example output for the
show chassis
command.
prtlndA>
show
chassis
Identification:
Hostname
UUID
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
prtlndA
876616f6
‐
79ac
‐
11d8
‐
946f
‐
958gcb4e6e35
Chassis:
Chassis
Type
Model
Number
HW
Ver.
Serial
Number
‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐
ARX
‐
2000
ARX2000URLX
02010646
Private
Subnet:
VLAN
Subnet
Subnet
Mask
‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
1008
169.254.100.0
255.255.255.0
Chassis
Environment:
Base
MAC
Address
Power
Fan(setting)
Temperature
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐
00:0a:49:17:af:00
Online
Online
Normal(<62
C)
Summary of Contents for ARX-2000
Page 1: ...ARX 2000 Hardware Installation Guide 810 0062 00 ...
Page 2: ......
Page 6: ...vi ...
Page 7: ...Table of Contents ...
Page 8: ......
Page 11: ......
Page 12: ...Table of Contents xii ...
Page 14: ......
Page 22: ......
Page 28: ...Chapter 2 Unpacking and Installing the Switch 2 8 ...
Page 30: ......
Page 48: ...Chapter 3 Connecting the Switch to the Network 3 20 ...
Page 49: ...4 Maintenance Powering Down the ARX 2000 LED Indicators POST Diagnostics ...
Page 50: ......
Page 60: ......
Page 72: ...Appendix A Removing and Replacing FRUs A 14 ...
Page 73: ...B Installing the Rail Kit Installing the Rail Kit ...
Page 74: ......
Page 76: ...Appendix B Installing the Rail Kit B 4 ...
Page 77: ...Index ...
Page 78: ......
Page 80: ...Index Index 4 ...