The procedure has ended and the gate is ready to 
operate, using default slow down automatically set 

by the control panel. 
 

C

OMPLETE

 L

EARNING

 

 

N

OTES

:    

 

• 

If only one gate operator (1) is used, you 
must go through the entire programming 

procedure, as if you were programming a 
gate operator (2).  When the gate operator 
(1) has finished opening, supply 5 open 

commands until the gate operator begins 
to close, and then resume normal 
operations.

 

 
Close the gates, enter 

“B

ASIC

  P

ROGRAMMING

, select 

the TIME LEARNING function and press the + push-

button for more than 3 seconds: the display begins 
flashing and leaf 1 begins opening movement.  The 
following functions can be commanded by the OPEN 

A command (by radio control or key push-button): 
 

• 

When gate operator (1) reaches the 
position that you want it to slow down, an 

open command must be given to start the 
slow down phase.  When the gate operator 
reaches its positive stop, the operator will 

automatically shut off. 

• 

An open command must be given to start 
opening gate operator (2).   

• 

When gate operator (2) reaches the 
position that you want it to slow down, an 
open command must be given to start the 

slow down phase.  When the gate operator 
reaches its positive stop, the operator will 
automatically shut off. 

• 

An open command must be given to start 
closing gate operator (2).   

• 

When gate operator (2) reaches the position 
that  you  want  it  to  slow  down,  an  open 
command must be given to start the slow 
down phase.  When the gate operator reaches 

its positive stop, the operator will 
automatically shut off. 

• 

An  open  command  must  be  given  to  start 
closing gate operator (1).   

• 

When gate operator (1) reaches the position 
that  you  want  it  to  slow  down,  an  open 

command must be given to start the slow 
down phase.  When the gate operator reaches 

its positive stop, the operator will 
automatically shut off. 

 

The display stops flashing and the gate is ready for 
normal operation. 
 

N

OTES

:    

 

• 

The open command to slow down the gate 
should be given before the gate reaches the 

positive stop  to prevent the gate from hitting 
the stop at full speed.  The positive stop could 
be mistaken for an obstacle and then upon 

hitting it, the gate(s) would automatically 
reverse on contact.   

 

 

A

UTOMATED

 S

YSTEM

 T

EST

 

 

When you have finished programming, check if the 
system is operating correctly. 

 
Most important of all, check that the force is adequately 
adjusted and that the safety devices are operating 

correctly. 
 
If pressure adjustments on hydraulic operators are not 

set before programming.  It may need to be 
reprogrammed for desired results. 

Summary of Contents for 412 Compact

Page 1: ...l the Operator 7 Install the 455 D Control Panel 10 Exploded View 412 12 412 Parts List 13 The 455 D Control Panel General Description 14 Installing the 455 D Control Panel 14 Connect the Main Power S...

Page 2: ...affected by the size of the gate how often it is used and how fast the gate operates 2 The operator you choose to install on your gate must be designed for the type and size of your gate and for the...

Page 3: ...power before making any attempt to repair it 4 Do not attempt to impede the movement of the gate You may injure yourself as a result 5 This equipment may reach high temperatures during operation ther...

Page 4: ...aximum leaf swing deg 110 Thrust and traction3 ft lb Nm 0 294 0 400 0 235 0 320 Stroke in cm 11 3 8 29 Rod speed 4 in sec cm sec 3 4 1 9 5 8 1 6 Thermal cut out deg F deg C 284 140 Operator dimensions...

Page 5: ...s marked DX Be sure to install each on the proper gate leaf see Figure 2 2 Protective covers for the worm screw housing of the operator 1 Package of mounting hardware 2 Rear mounting brackets 2 Rear m...

Page 6: ...anism that precisely controls the force transmitted to the gate leaf through the 412 Operator The Manual Release mechanism is a key operated device that disengages or engages the worm screw drive of t...

Page 7: ...e where the operators are mounted The operator attached to the hinge on the left of the gate must be an SX model If the hinge is on the right side the DX model must be installed Installing the operato...

Page 8: ...front mounting bracket with the short pin and one snap ring on the bottom and one snap ring on the top see Figure 9 11 13 16 in 30 cm 4 in 10 cm 5 29 32 in 15 cm Figure 6 The required dimensions of th...

Page 9: ...Gate post or column Steel elbow A B C D F Centerline of gate leaf E Mounting Dimensions 90 deg Swing 110 deg Swing A 5 3 4 in 14 5 cm 4 7 8 in 12 5 cm B 5 3 4 in 14 5 cm 4 7 8 in 12 5 cm WARNING A an...

Page 10: ...OPERATOR COVER Once the operator is attached to the gate leaf you next prepare the cover for installation Caution If you did not correctly establish the orientation of the gate leaf and properly inst...

Page 11: ...d 455 D Control Panel Installation Manual 1 Operator Wire Gauges for Given Voltage 2 Control Panel 220 VAC 115 VAC 3 Photocell A 2 18 AWG A 2 18 AWG 4 Switch B 4 14 AWG B 4 14 AWG 5 Junction box see t...

Page 12: ...Page 12 January 2004 412 Operator And 455 D Control Panel Installation Manual The 412 Compact Operator...

Page 13: ...p Protective Cover SX 1 8 727147 End Cap Protective Cover DX 1 9 N A Nickel Plated Self Tapping Screw 3 5 x 9 5 mm 3 10 2705 Capacitor For 115 v 25 f 1 10 2707 Capacitor For 220 v 8 f 1 11 727216 Prot...

Page 14: ...that the entire gate system meets all applicable electrical codes The installer should refer to the installation manual for a given operator for more information NOTE An installation is U L compliant...

Page 15: ...e to 2 and the red wire to 3 Wire each leg of the capacitor supplied to terminals 2 3 Note If you want to delay the closing of one gate leaf in a two leaf gate design be sure to connect its operator t...

Page 16: ...in power and send an activating signal to the operator The gate leaf or leaves should open If a gate leaf closes then you need to turn off the main power and reverse the connection of the red and blac...

Page 17: ...e motors without a closed circuit between 11 14 The LED Indicators The nine light emitting diodes LEDs on the control panel can be used to check for the proper function of the devices attached to the...

Page 18: ...he delayed leaf closes at the end of the closing time opening and closing respectively are triggered Use the LEDs and the next table to determine if the accessory devices you have installed are operat...

Page 19: ...ev ices 14 9 C NO Rev ersing Photocells f or opening 1 2 1 2 3 4 5 17 13 19 14 17 Additional Reversing Devices TX RX 1 2 1 2 3 4 5 19 17 12 19 17 Additional Reversing Devices TX RX 1 2 19 12 17 15 Add...

Page 20: ...he value that can be modified with keys and When you reach the last function press the F key to exit the program and the display resumes showing the status of the inputs The table on page 21 shows the...

Page 21: ...ou sands from 0 to 99 thousand cy cles The displayed value is up dated as cycles proceed This func tion can be used to check use of the board or to exploit the Assistance Request function EXTRA WORK T...

Page 22: ...ay stops flashing LEARNING OF OPERATING TIMES WARNING During the learning procedure the safety devices are disabled Therefore any and all traffic must be avoided in the path of the gate leaf s NOTE Pr...

Page 23: ...and must be given to start the slow down phase When the gate operator reaches its positive stop the operator will automatically shut off An open command must be given to start closing gate operator 2...

Page 24: ...g Reversing Device s Warning Light Closed Opens both leaves and closes them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Ope...

Page 25: ...s in hibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer trig gered No effect On Opened Closes both le...

Page 26: ...directions before the automatic operator is installed An automatic operator should be installed on the inside of the property fence line Do not install the operator on the public side of the property...

Page 27: ...OPENS BUT DOES NOT CLOSE SOLUTION Make sure you have selected the desired operating mode Verify that the reversing devices are working properly FSWOP and FSWCL should be illuminated except when a rev...

Page 28: ...rdance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceeding those set forth in the specifications for such product s...