background image

8

ENGLISH

ENGLISH

N.B

.: 1) Grease all pivots on brackets

2) If welding is not possible, the front and rear

bracket plates are also designed for  fixing by
screws and screw anchors.

12) Fit the cover (fig. 7) on the operator as shown in fig. 8.

N.B.:

 Fix the guide support of the cover on the hole furthest

from the cap (fig.7).

13) Repeat the above operations to install the second operator.
14) Make the control unit connections.
15) Programme the control unit to set the specific installation

requirements.

Fig. 9

Fig. 10

SBLOCCA

DESBLOQUEAR

DEBLOQUE

UNLOCK

ENTRIEGELT

BLOCCA

BLOQUEAR

BLOQUE

LOCK

VERRIEGELT

SBLOCCA

DESBLOQUEAR

DEBLOQUE

UNLOCK

ENTRIEGELT

BLOCCA

BLOQUEAR

BLOQUE

LOCK

VERRIEGELT

4. TESTING THE AUTOMATED UNIT

On completing installation, affix a danger warning adhesive
label in a clearly visible position on the side of the operator (fig.
9).
Careful check operation of the operator and all accessories
connected to it.
Give the customer the “User guide” and demonstrate how to
use the operator correctly. Point out the potential danger
zones of the automated unit.

5. MANUAL OPERATION

In the event of a power failure or malfunction, the gate can be
operated manually by removing the plug and inserting the
special release key as shown in fig. 10.
To release the operator, turn the key in the direction of leaf
closing (fig. 10).
Open or close the leaves manually.

6. RETURNING TO NORMAL OPERATION

Turn off the electricity supply to the system before re-locking
the operators to avoid all risk of starting them accidentally.
To re-lock the operator, turn the key in the leaf opening
direction (fig. 10).

Fig. 7

Fig. 8

7. SPECIAL  APPLICATIONS

There are no special applications.

8. MAINTENANCE

Carry out periodic checks of the gate structure and ensure in
particular that the hinges are in perfect working condition.
Check periodically that the electronic anti-crushing system is
adjusted correctly and that the release mechanism for manual
movement is fully operative (see relative paragraph).
Safety devices installed on the plant must be checked every
six months.

9. REPAIRS

For repairs, refer to authorised FAAC service centres.

Reviews: