background image

8

ENGLISH

fig. 16

POSITIONING THE FORK SUPPORT FOUNDATION PLATE

To position the foundation plate of the fork support, refer to 

fig.16 where:

P1 = barrier foundation plate

P2 = fork support foundation plate

L = beam length (in mm)

A = L - 195 (in mm)

Whenever doing maintenance, always check correct 

settings of the by-pass screws, system balancing, and 

efficiency of safety devices. The automated system does 

not require any type of oil topping-up.

fig. 17

fig. 14

SKIRT KIT  (fig.14)

The skirt kit increases visibility of the beam.

It is available in lengths from 2 m to 3 m.

 

     If a skirt kit is installed, the balancing spring must be

     adapted.

FORK SUPPORT (fig.15)

The fork has two functions:

-  it prevents the beam, when closed, from bending or splitting 

if its end is stressed by extraneous forces.

- it allows the beam to rest when closed and thus prevents 

the profile bending downward.

fig. 15

ARTICULATION KIT (fig.17)

The articulation kit makes it possible to articulate a rigid 

beam to a maximum ceiling height of 3 m. (see specific 

instructions).

Dimensions are in mm.

fig. 18

END FOOT (fig.18)

The end foot allows the beam to rest when closed and thus 

prevents the profile bending downward.

For any repairs, contact FAAC’s authorised Repair Centres.

9 AVAILABLE ACCESSORIES

If the articulated kit is installed, the balancing 

spring must be adapted.

If a foot is installed, the balancing spring must be 

readjusted.

10 MAINTENANCE 

11 REPAIRS

Summary of Contents for 615

Page 1: ...615 615...

Page 2: ...ur les remarques concernant les caract ristiques ou le fonctionnement du produit Vor der Installation des Produkts sind die Anweisungen vollst ndig zu lesen Mit dem Symbol sind wichtige Anmerkungen f...

Page 3: ...4 INSTALLING THE AUTOMATED SYSTEM 4 4 1 PRELIMINARY CHECKS 4 4 2 MASONRY FOR FOUNDATION PLATE 4 4 3 INSTALLING THE UPRIGHT 4 4 4 INSTALLING THE BEAM 4 4 5 INSTALLING AND ADJUSTING THE BALANCING SPRIN...

Page 4: ...osing elements to be motorised or for any defor mation that may occur during use 10 The installation must conform to Standards EN 12453 and EN 12445 For non EU countries to obtain an adequate level of...

Page 5: ...cycle opening closing pause times Calculation formula where Ta opening time Tc closing time Tp pause time Ti interval time between onecompletecycleand another foundation plate barrier upright control...

Page 6: ...3 INSTALLING THE UPRIGHT 4 4 INSTALLING THE BEAM The 615BPR automated system is always supplied intheright handversion forleft handinstallation see chapter 5 5 1 Makesurethattherodofthepistonsecuredt...

Page 7: ...5 ENGLISH fig 7b fig 5 fig 7a IMPORTANT moderatelytightenthe pocket securing screw max 30Nm fig 6 fig 8 IMPORTANT moderatelytightenthepocketsecuring screw max 30Nm...

Page 8: ...g for the beam which must be ordered separately The spring varies according to length and type of beam rigid skirt or articulated Consult the tables below to see if the spring matches 5 BALANCING SPRI...

Page 9: ...11 ref 1 Fit the standard triangular key Fig 13 in the lock and turn it anti clockwise through 1 turn Open and close the barrier manually To prevent an involuntary impulse from activating the barrier...

Page 10: ...pring must be adapted FORK SUPPORT fig 15 The fork has two functions itpreventsthebeam whenclosed frombendingorsplitting if its end is stressed by extraneous forces it allows the beam to rest when clo...

Page 11: ...in vorliegendem Handbuch sind unverbindlich FAAC beh lt sich das Recht vor ohne die wesentlichen Eigenschaften dieses Ger tes zu ver ndern und ohne Verbindlichkeiten in Bezug auf die Neufassung der v...

Reviews: