B614
17
732998 - Rev.A_DRAFT
Tr
ansla
tion of the original instruc
tions
ENGLISH
5. MECHANICAL INSTALLATION
F
Perform the operations when there is no electrical power.
!
The installation must comply with Standards EN 12453
and EN 12445.
Mark off the work site and prohibit access/transit. Before
the barrier is fixed to the foundation there are risks of
tripping and falls.
When working in the box there are risks of cutting,
shearing, crushing hands due to the presence of moving
parts. Until the installation is completed, the partially
installed barrier must always be left blocked and with
the door and upper lid always closed to prevent access
to the electronic parts and the moving mechanical pars.
Never install the beam before fixing the barrier body
and checking it.
Until the installation is complete, never leave the barrier
unguarded with the beam fitted. If the beam is fitted,
the barrier must be locked with the beam open.
If installation is outside it must be done in good
weather without rain or gusts of wind. If it is raining
an adequate shelter for the barrier must be made until
the mechanical and electronic installation is complete.
Never manage the barrier by holding the board holder.
5.1 TOOLS REQUIRED
8-13-17-19
Hex wrench
4-6
Allen key
Level
TOOL with TORQUE ADJUSTMENT
Where necessary for safety, a torque wrench with the
specified tightening torque will be shown.
TIGHTENING TORQUE VALUE
The torque wrench and the tightening torque in Nm
is shown in the figures. E.g.: HEX WRENCH 6 set at
2.5 Nm
6
2.5
Nm