1. Position the operator over the foundation plate and
slide the treaded part of the bolts thought the oblong
holes on the outside of the base of the opener.
If the height of the operator from the slab ever has to be
adjusted, the nuts just above the plate can be moved up
the threading and the operator can rest on the nuts (as
seen in the illustration to the right).
2. Feed any wires up through the opener while installing
the opener to the base.
1. Manually take the leaf to its close position.
2. Lay the first piece of rack at the appropriate level
and mark the hole position on the gate. Make a hole
and use nuts, bolts and washers to make a connec-
tion to the gate (not provided).
The holes in the rack are made oblong for adjust-
ment after the holes are drilled. No special bolts are
required for mounting, simply tightening the bolts
will hold the rack secure.
5.3
Securing the Operator
Rack Installation