UK/IRL
18
<
<
<
<
5
Instructions for installation
5.1
Gas Connection
1)
Installation pipes should be in accordance with BS 6891. Pipe work
from the meter to the appliance must be of adequate size.
2)
The complete installation including the meter must be tested for
soundness and purged as described in the above code.
3)
A means of isolation must be provide in the supply to facilitate
servicing.
4)
The connection should be made in 8 mm copper or similar semi
flexible tube. (max 1 meter). Ensure that the gas pipe does not
interfere with the removal or replacement of the burner tray of the
controls.
5)
The gas connection is nut and olive suitable for 8 mm pipe.
5.2
Preparing the appliances
Before you can install the appliance properly, it is wise to prepare the
appliance, because you still have access to all parts of the appliance.
These will be barely reacheable once the appliance is installed. In the
next paragraphs these preparations will be described for the different
models.
Summary of Contents for BF80S
Page 2: ...UK IRL 2 ...
Page 45: ...UK IRL 45 User guide ...
Page 46: ...UK IRL 46 ...
Page 55: ...UK IRL 55 ...