background image

 

 

 

 

Manual 

e-MatriX 800/500 RD,ST (LL) 

ENG 

 

 

 

40011693-1845 

 

Summary of Contents for e-MatriX 800-500 ST LL

Page 1: ...Manual e MatriX 800 500 RD ST LL ENG 40011693 1845 ...

Page 2: ...Manual e MatriX 800 500 RD ST LL 2 Registration plate ...

Page 3: ...Manual e MatriX 800 500 RD ST LL 3 1 0 1 1a 1 1b 1 2 2 0a ...

Page 4: ...Manual e MatriX 800 500 RD ST LL 4 2 0b 2 0c 2 1 2 2 2 3a 2 3b 2 3c ...

Page 5: ...Manual e MatriX 800 500 RD ST LL 5 2 3d 2 3e 2 3f 2 4a 2 4b 2 4c 2 4d 2 4e ...

Page 6: ...Manual e MatriX 800 500 RD ST LL 6 3 0a 3 0b 3 1a 3 1b 3 1c 4 0 ...

Page 7: ...Manual e MatriX 800 500 RD ST LL 7 4 1 4 2 4 3 5 0 ...

Page 8: ...Manual e MatriX 800 500 RD ST LL 8 6 0 6 1 ...

Page 9: ...Manual e MatriX 800 500 RD ST LL 9 7 0 7 1 7 2 7 3 7 4 8 0 ...

Page 10: ...s The product complies with the European Safety Standards EN60335 2 30 and the European Standard Electromagnetic Compatibility EMC EN55014 EN60555 2 and EN60555 3 these cover the essential requirements of EEC Directives 2006 95 EC and 2004 108 EC This declaration is invalid if changes are made to the fire 2 Safety instructions Do not use outdoors Do not use in the immediate surroundings of a bath ...

Page 11: ...ithout cover strip A Remove distance holder B around Build the false chimney breast or plateau against the appliance 4 3 2 e MatriX ST see fig 1 2 4 3 2 1 With cover strip A Build the false chimney breast or plateau against the appliance 4 3 2 2 Without cover strips A Remove the cover strips A See fig 1 2 Build the false chimney breast or plateau against the appliance 4 4 Control box Place the Con...

Page 12: ...Chapter 9 and check all connections for water leakage before placing the fuel bed and front glass 4 5 Build in structure The e MatriX needs a minimum ventilation of 50cm above and 210cm underneath the fire The construction may not rest on the fire The e MatriX needs a minimum free space of 50mm above the fire 5 Removing glass 5 1 Front glasses e MatriX RD 5 1 1 Front glass see fig 1 1a provide ser...

Page 13: ...ee Chapter 5 1 1 or 5 2 1 Cover remove the frame to avoid scratches see fig 3 0b Turn the handles in the fuel bed see fig 3 0a Lift up the fuel bed carefully disconnect the plug and store it at a safe place see fig 3 0b 6 2 e MatriX 800 500 RD ST LL Large Logs Remove the front glass see Chapter 5 1 1 or 5 2 1 Cover remove the frame to avoid scratches see fig 3 1c First remove the two small logs se...

Page 14: ...l valves are open and turn on the water supply Switch the fire on by pressing the mains switch to the ON position and pressing the button see Chapter 8 1 and 8 2 o If the water level is high enough the flames will automatically start after 45 seconds o If the water level isn t high enough the LED s continuously to blink twice after 45 seconds Press the mains switch to the OFF position wait 5 secon...

Page 15: ...lity and or the running hours and therefore can differ from the above mentioned 10 1 1 Cleaning water sump Always press the mains switch to the OFF position and disconnect the power supply see fig 4 0 Never use abrasive cleaners Remove the front glass see Chapter 5 1 1 or 5 2 1 Remove the fuel bed see Chapter 6 Disconnect the fill cap by turning it clockwise see fig 5 0 L and 7 0 Disconnect the 2 ...

Page 16: ... transducer upwards out of its holder Place the new transducers and repeat the steps above in reverse order 10 1 4 Cleaning mesh filter Turn off the water supply Close the ball valves Unscrew the base and clean the filter inside 10 1 5 Replacing in line filter Turn off the water supply Close the ball valves Replace the in line filter Place it in correct alignment there s a flow direction marking o...

Page 17: ...link once every eight seconds Water level too high Check the electromechanical valve in the Control box e MatriX will not operate the LED s continuously to blink four times Water filling time is too long Switch the mains switch of the Control box to the OFF position and heck all connections on water leakage Close the ball valves and check the mesh filter see fig 5 0 F by unscrewing the base of it ...

Page 18: ...Manual e MatriX 800 500 RD ST LL 18 13 Dimensional Drawings 13 1 e MatriX 800 500 RD LL ...

Page 19: ...Manual e MatriX 800 500 RD ST LL 19 13 2 e MatriX 800 500 ST LL ...

Page 20: ...Manual e MatriX 800 500 RD ST LL 20 13 3 Control box ...

Page 21: ...Manual e MatriX 800 500 RD ST LL 21 13 4 Remote access door ...

Page 22: ...Manual e MatriX 800 500 RD ST LL 22 ...

Page 23: ...Manual e MatriX 800 500 RD ST LL 23 ...

Page 24: ...www faber fires eu info faber fires eu Saturnus 8 NL 8448 CC Heerenveen Postbus 219 NL 8440 AE Heerenveen ...

Reviews: