25
EN
77
INSTALLATION
Fitting the Hood canopy
BEFORE FITTING THE HOOD TO THE WALL UNIT, PROCEED AS FOLLOWS:
• Disconnect the wires to the Commands at the connectors.
• Disconnect the wires to the Light at the con-
nectors.
• The Hood can be installed directly on the
underside of the wall unit (Minimum 650 mm
from the Cooker Hob).
• Create an opening in the bottom of the wall unit,
as shown.
• Insert the hood until the side supports snap into
place.
• Fasten using the 10 screws
12a
provided.
• Lock in position by tightening the screws
Vf
from
underneath the hood.
• Open the suction panel by turning the specific knob.
• Disconnect the panel from the hood canopy by sliding the
fixing pin lever.
• Remove grease filters.
• Screw the Frame into place
using the 6 screws
12f
, re-
connect the wires to the
Commands and Light, re-
place the metal grease filter
and the Panel.
260
13
495 - 675
CARING FOR FILTERS
CLEANING METAL GREASE FILTERS
The metal grease filters can be cleaned in hot detergent solution or washed
in the dishwasher. They should be cleaned every 2 months use, or more fre-
quently if use is particularly heavy.
1. Open the Panel by pulling it down.
2. Remove the filter, pushing the lever towards the back of the unit
and at the same time pulling downward.
3. Wash the filter without bending it, leave it to dry thoroughly before
replacing (if the surface of the filter changes color over time, this
will have absolutely no effect on its efficiency).
4. Replace, taking care to ensure that the handle faces forward.
5. Cleaning in dishwasher may dull the finish of the metal grease filter.
6. Close the Panel.
7. Completely dry the filters before installing back into the hood. No
water should be trapped in the filter before reinstalling.
Z
Summary of Contents for INLT21SSV
Page 6: ...6 RANGE HOOD DIMENSIONS DRAFT 19 JUN 2020 14 46 21 28 35 21 28 35 DRAFT 19 JUN...
Page 7: ...7 INSTALLATION HEIGHT REQUIREMENTS MIN 24 OVER ELECTRIC MIN 30 OVER GAS Min 24 Min 30...
Page 9: ...9 A D E F Z B...
Page 28: ...28 120V 60Hz WIRING DIAGRAM...
Page 35: ...35 DIMENSIONS DE LA HOTTE DRAFT 19 JUN 2020 14 46 21 28 35 21 28 35 DRAFT 19 JUN...
Page 38: ...38 A D E F Z B...
Page 57: ...57 120V 60Hz SCH MA DE C BLAGE...
Page 64: ...64 DIMENSIONES DE LA CAMPANA EXTRACTORA DRAFT 19 JUN 2020 14 46 21 28 35 21 28 35 DRAFT 19 JUN...
Page 67: ...67 A D E F Z B...