Seat base fix detail
2
3
0
4
5
0
Ground
level
185 (Ctrs)
1800 (Ctrs)
335 (Ctrs)
1500 (Ctrs)
2300
475
500 x 400 x 2400mm
C20 Concrete Base
(recommended)
M10 x 30mm
button head bolt
FSC hard-
wood slat
Galvanised
mild steel
gabion
frame and
mesh
400
FFL
Galv. mild
steel frame
335 (Ctrs)
500 x 400 x 2400mm
C20 Concrete Base
(recommended)
400
FFL
335 (Ctrs)
500 x 400 x 2400mm
C20 Concrete Base
(recommended)
Gabion stone
infill not supplied
Galv. mild
steel frame
M10 x 30mm
button head bolt
FSC hard-
wood slat
M10 x 75mm
sleeve anchor
Gabion stone
infill not supplied
M10 x 75mm
sleeve anchor
Galvanised mild
steel gabion
frame and mesh
475
2
3
0
75
4
5
0
100
185
115
595
2
3
0
75
4
5
0
100
185
115
8
0
5
Bench base fix detail
Installation Instructions
ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT
Tord Gabion Bench (same fixing centres for seat)
Tord Gabion Bench / Seat
1. Install suitable foundation pad
(see illustration)
with top face at ground level
2. Position gabion base (empty and with bench / seat removed) in desired location and with base placed
centrally on foundation pad then mark hole positions onto pad
3. Remove the base; drill holes Ø12mm x 75mm deep
(or as bolt manufacturer’s recommendations)
4. Clear debris from holes
5. Reposition base and fix to foundation pad using 4 no. zinc-coated M10 x 75mm sleeve anchors tightened to
50Nm (or as per manufacturer’s instruction). Ensure base remains level during
fixing process
6. Fill gabion base with gabion stone
(supplied by others)
to a level approx. 20-40mm
below the top of the base
7. Reattach bench / seat unit using 4 off M10 x 30mm concealed button head bolts
accessible through the gaps between the slats)
5
TORD GABION
installation