background image

Seat base fix detail

2

3

0

4

5

0

Ground

level

185 (Ctrs)

1800 (Ctrs)

335 (Ctrs)

1500 (Ctrs)

2300

475

500 x 400 x 2400mm

C20 Concrete Base

(recommended)

M10 x 30mm

button head bolt

FSC hard-

wood slat

Galvanised

mild steel

gabion

frame and

mesh

400

FFL

Galv. mild

steel frame

335 (Ctrs)

500 x 400 x 2400mm

C20 Concrete Base

(recommended)

400

FFL

335 (Ctrs)

500 x 400 x 2400mm

C20 Concrete Base

(recommended)

Gabion stone

infill not supplied

Galv. mild

steel frame

M10 x 30mm

button head bolt

FSC hard-

wood slat

M10 x 75mm

sleeve anchor

Gabion stone

infill not supplied

M10 x 75mm

sleeve anchor

Galvanised mild

steel gabion

frame and mesh

475

2

3

0

75

4

5

0

100

185

115

595

2

3

0

75

4

5

0

100

185

115

8

0

5

Bench base fix detail

Installation Instructions

ALL INSTALLATION WORKS TO BE CARRIED OUT BY COMPETENT PERSONNEL - INSTALL AS COMPLETE UNIT

Tord Gabion Bench (same fixing centres for seat)

Tord Gabion Bench / Seat

1.  Install suitable foundation pad 

(see illustration)

 with top face at ground level 

2. Position gabion base (empty and with bench / seat removed) in desired location and with base placed 
    centrally on foundation pad then mark hole positions onto pad

3. Remove the base; drill holes Ø12mm x 75mm deep 

(or as bolt manufacturer’s recommendations)

4. Clear debris from holes

5. Reposition base and fix to foundation pad using 4 no. zinc-coated M10 x 75mm sleeve anchors tightened to 
    50Nm (or as per manufacturer’s instruction). Ensure base remains level during 
    fixing process

6. Fill gabion base with gabion stone 

(supplied by others) 

to a level approx. 20-40mm 

    below the top of the base

7. Reattach bench / seat unit using 4 off M10 x 30mm concealed button head bolts 

 

    accessible through the gaps between the slats)

5

TORD GABION 

installation

Reviews: