FITTING THE POWER SUPPLY CABLE
GATE OPENING INWARDS
ELPRO 42
Pic. 14
Pic. 15
Once the electrical
connections are finished,
tighten the gland locknut
Let the cable dangle free
avoiding sharp bending
IMPORTANT: the terminals of M1 (A1, B1, C1) and M2 (A2, B2, C2) motors in the controller correspond to:
- M1 = Dardo on 1st gate leaf to open and in pedestrian mode if selected.
- M2 = Dardo on the gate leaf delayed in opening.
IMPORTANT: on single gate installations where only one operator is mounted, it is sufficient to connect
the motor to M1 and bridge B1 with B2, while A2 and C2 terminals are not connected.
Dardo M2
Dardo M1
Terminal block for
electrical connections
A
A
B
B
C
C
A2 B2 C2
A1
A B C
B1 C1
Dardo M2
power supply
Dardo M1
power supply
Dardo
terminals
Dardo
terminals
!
!
electromechanical operator for swinging gates
DARDO 424
DARDO 424
English
23