background image

VIGILO

VIGILO

6

!

!

1,0 m - str

oke 500

1,2 m - str

oke 600

1,3 m - str

oke 800

Cover with
about 30 cm
of concrete

Spirit level

30 cm

15 cm

12 cm
depth piping
centre

15 cm
loose pebble
drainage layer

170

410

410 mm

Ø 60

Ø 275

FRONT SIDE

Soakaway pebbles

Possible

submersed

pump

87 cm

FRONT SIDE

87 cm

43,5 cm

43,5 cm

23 cm

23 cm

English

fully retractable oil-hydraulic bollard

Pic. 4

Pic. 5

850 - str

oke 500 mm

960 - str

oke 600 mm

1.140 - str

oke 800 mm

ARRANGING THE HOUSING

Check soil natural permeability: 50 liters of water must be 
able to soak away in not longer than 30/40 minutes. 
Otherwise provide a pipe to allow rain water to flow either 
into the sewage system or a sump well equipped with a 
submersed pump.

IMPORTANT: once the housing has been positioned and installation completed, it is important for the top edge 
to be level with the ground.

Housing

Concrete

cast

Piping Ø 5 cm

for passage

of electric wires

Summary of Contents for VIGILO 2250

Page 1: ...EN 13241 EN 12453 EN 12445 VIGILO VIGILO 2250 2263 2280 2250 2263 2280 GB Instructions manual pages 1 16 the gate opener FULLY RETRACTABLE OIL HYDRAULIC BOLLARDS POST DIAMETER 100 mm...

Page 2: ...e mains by switching off the master switch If removing the actuator do not cut the electric wires but disconnect them from the terminal box by loosening the screws inside the junction box INSTALLATION...

Page 3: ...e of rust treated steel 200 mm diameter bollards are also available in stainless steel AISI 304 version The product s hallmark is its ease of installation once the housing has been secured the operato...

Page 4: ...ractable post with hoisting connection English fully retractable oil hydraulic bollard PRELIMINARY OPENING OF ALL FUNCTIONAL COMPONENTS Start by removing the cover plate to reveal the operator and sep...

Page 5: ...lectricity cables with a 1 5 mm section for a maximum distance of 50 metres For distances of over 50 metres use electric cables with sections suited to the installation 2x1 mm cable RG58 1 MIRI 4 Led...

Page 6: ...draulic bollard Pic 4 Pic 5 850 stroke 500 mm 960 stroke 600 mm 1 140 stroke 800 mm ARRANGING THE HOUSING Check soil natural permeability 50 liters of water must be able to soak away in not longer tha...

Page 7: ...e housing The subsequent phase of this operation consists in threading the motor limit switch solenoid valve and LED power supply electric wires through the piping and simultaneously starting to delic...

Page 8: ...ng and controlling operations The magnetic loop detector is a safety device operating all the time to detect any transiting vehicle the bollard is prevented from rising should a vehicle cross the loop...

Page 9: ...ts on the Elpro S40 board are to be bridged and the respective connections with the Elpro S40 programmer and having completed thorough risk analysis the first operation manoeuvres can be performed If...

Page 10: ...ilizer to terminals 22 and 23 in the Elpro S40 control box Pic 12 VIGILO with solenoid valve VIGILO with solenoid valve VIGILO with solenoid valve SOLENOID VALVE STABILIZER GROUND LEVEL CLOSURE COVER...

Page 11: ...Dimensions per gate leaf Weight per gate leaf Installation date Quantity of models installed Maintainer Date NOTE WELL this document must record any ordinary and extraordinary services including inst...

Page 12: ...English VIGILO VIGILO fully retractable oil hydraulic bollard 12...

Page 13: ...the electronic board controlling the bollard s e g flooded relay contacts oxidized terminal clamps etc Check the correct functioning and positioning of the limit switches Check the release system for...

Page 14: ...ned these are to comply with the laws in the country of installation Meccanica Fadini is not liable for any possible damages derived from incorrect use or from any use not indicated in this manual fur...

Page 15: ...263 Frequency of use intensive Service cycle rise 5 9 s dwell 30 s lower 5 2 s dwell 30 s Complete cycle time 71 s Complete cycles rise dwell lower dwell No 51 hour Annual cycles with 8 hours of use p...

Page 16: ...275 G 850 960 1 140 H 1 350 1 560 1 940 Pic 15 30 000 J 160 000 J Various factors such as the compaction index soil permeability coefficient and kind of concrete may reduce the values indicated in th...

Reviews: