EN
7
1
1 / INSTALLING YOUR APPLIANCE
•400 V 2N triphase hook-up
1
16
6
-amp fuse.
Separate the two phase wires (L1 and L2)
before hooking up.
NN
ee
uu
ttrr
aa
ll
GG
rroo
uu
nn
dd
PP
hh
aa
ss
ee
N
N
L
L
Green/yellow
Blue
Brown
NN
ee
uu
ttrr
aa
ll
GG
rroo
uu
nn
dd
PP
hh
aa
ss
ee
22
PP
hh
aa
ss
ee
11
N
N
L
L1
1
L
L2
2
Blue
Green/yellow
Brown
•220-240 V monophase hook-up
3
32
2- amp fuse.
Warning
If the power cable is damaged, it
should be replaced by the manufacturer, its
after-sales service department or by a per-
son with similar qualifications to avoid dan-
ger.
For a 400 V 2N triphase hook-up, if your hob
malfunctions, check that the neutral conduc-
tor is properly connected.
These hobs must be connected to the power
grid via an electrical outlet that complies with
EIC publication 60083 or an all-pole cut-off
device that complies with installation regula-
tions in effect.
When power is first supplied to your hob, or
after an extended power outage, an indicator
light will appear on the control panel. It auto-
matically disappears after approximately 30
seconds, or as soon as any touch control on
the control panel is pressed. This display is
normal and, if needed, serves as an indication
to the after-sales service staff. In all cases, the
user of the hob should disregard it.
HOOK-UP
•
•
•
•
IT IS IMPERATIVE that you mount the protec-
tive flue with a cable clip.
Black or grey
Black or grey
99641781_A_ML.qxp 23/01/2007 11:37 Page 7