background image

2-4

T

ESTING

 

AND

 C

OMMISSIONING

Step 3

Select 

Station

 console type and click the 

Add Panel

 button to 

add panels one at a time. 

Step 4

Select panel number 

Panel 15

, then select 

StationMainMeters

 

type. Click 

OK

 

to add the panel.

To remove an accidentally added panel, select the panel and click 

Remove Panel

To modify a panel, select the panel and click 

Modify Panel

.

Figure 3: ConsCon Window

Configuring Two Meter Units

If two Channel Meters are to be fitted, the Fairlight distributor must be informed 
prior to shipping in order for the panel configuration of the second meter to be 
modified. When two Channel Meters are present, the first meter is configured with 
panel ID 15, the second meter with ID 16.

TESTING AND COMMISSIONING

Once the Station Channel Meter has been installed, configured and calibrated, refer 
to the Station manual for operational procedures that will assist in testing its oper-
ation within the studio environment.

Summary of Contents for DREAM Station SCP1

Page 1: ...Station Channel Meter Panel Installation Manual Document No 220 Part No DBE1201 A DREAM Software Version 1 1 SCP1...

Page 2: ...r implied with respect to the system s performance or fitness for a particular purpose In no event will Fairlight ESP Pty Ltd be liable for direct or indirect damages arising from any defect in the pr...

Page 3: ...t 45th Street Penthouse New York NY 10036 USA Tel 1 212 819 1289 Fax 1 212 819 0376 United Kingdom France Fairlight ESP Limited Unit 12 Spectrum House 32 34 Gordon House Road London NW5 1LP England Te...

Page 4: ...UCTION 2 2 MECHANICAL INSTALLATION 2 2 Tools Required 2 2 CONNECTING THE STATION METER PANEL 2 2 Connecting Two Meters 2 3 CONFIGURATION 2 3 USB Installation 2 3 Cons con 2 3 Configuring Two Meter Uni...

Page 5: ...used in conjunction with the DREAM Station and Sidecar Installation and User Manuals to obtain complete instruction in the use and instal lation of the complete system This manual is designed to fami...

Page 6: ...2 1 NOTES...

Page 7: ...nserting the M4 hex head bolts supplied with the Channel Meter Carefully tighten the bolts with a spanner Figure 1 Station Console Rear Panel Connections CONNECTING THE STATION METER PANEL Step 1 Conn...

Page 8: ...lation The USB driver for the Meter Panel must be installed the first time it is connected to the system Step 1 Ensure the Meter Panel is connect to the Station and that the Sta tion is running Step 2...

Page 9: ...re 3 ConsCon Window Configuring Two Meter Units If two Channel Meters are to be fitted the Fairlight distributor must be informed prior to shipping in order for the panel configuration of the second m...

Page 10: ...3 1 NOTES...

Page 11: ...USB and DC Power connection Connector 5 Pin XLR Male DIMENSIONS AND WEIGHT DREAM Station Main Meter Panel Note All specifications subject to change without notice XLR5 SIGNAL PAIR PIN 1 USB 1 PIN 2 0...

Page 12: ...D Depth 3 2 Dimensions 3 2 DREAM Start 2 3 F Found New Hardware 2 3 H Height 3 2 M Mechanical Installation 2 2 Meter 2 2 Modify Panel 2 4 R Remove Panel 2 4 S Specifications 3 2 Station 2 2 U USB 2 2...

Reviews: