Maintenance of the hydraulic system
Cleaning and replacing oil
Three months after commissioning the lift, drain all oil out of the hydraulic sytem and fill the system
with new oil. Afterwards this has to be done every six months, clean the hydraulic sytem and replace
the oil.
Replacing gaskets
In case of a hydraulic leakage, subject the machine to a thorough inspection. If the leakage is caused
by one or more worn gaskets you need to replace them immediately.
Inspection
CAUTION! The 2-post lift has to meet the following demands/standards
.
-
When commissioning, check if the manual is complete with EG-declaration of
conformity, standard maintenance protocol and inspection certificate.
-
Every 12 months the lift has to be inspected according to national norms by a specialized
company and/or person.
-
Valkenpower BV remains adhered for carrying out any inspections prescribed by law.
-
A thorough inspection for deformation by shockloads, corrosion, cracks and deformation
has to be carried out every month when the lift is intensively used.
Maintenance
CAUTION! Checks and maintenance operations may only be performed by specialized mechanics.
-
Check if the lift functions properly previous to each use.
-
In case of uncertainties or deformation, the 2-post lift has to be taken out of use
immediately.
-
Broken parts may only be replaced by original Falcvo-parts, this may only be done by
specialized mechanics. Failure to heed these instructions may invalidate the warranty.