22
5.
Attach the two mounting brackets to the rack’s mounting rails.
6.
After checking alignment, tighten all screws.
7.
Insert the UPS, with inner parts attached, into the slide assemblies. You may need to depress
the locking mechanisms on the inner and outer parts of the slide assemblies to allow the slides
to retract. The UPS should move smoothly forward and backward on the slide assemblies. If
not, recheck alignment. (SGRMKIT shown with optional DP70357 brackets)
Summary of Contents for SSG6KRM-2
Page 2: ...2...
Page 5: ...5 Double Conversion On line UPS Block Diagram...
Page 7: ...7 Symbols Important Instruction Special Note Recycle Do not dispose with ordinary trash...
Page 12: ...12 SSGR SSGR 1 2 Models...
Page 25: ...25 SSG6KRM 2TXI With Transformer Module Warning Utility sources must be of the same phase...