Battery Bank Installation
SSG6KRM Models
Warning: Verify the battery circuit breakers on the SSGR battery banks are in the off position
prior to installing battery cables.
Note: The SSGR Battery Banks are shipped with the internal battery packs preinstalled.
1. Remove the Battery Connector cover plates to expose the battery connectors as shown below.
2. Assure the battery circuit breakers are in the off (down) position before connecting the cables as
shown below.
3. If extended banks are used, continue the connections sequence as shown. (The cover plates
can be left on if no additional banks are used.)