UPS Start-up Procedure
SSG6KRM Models:
1. Place the battery circuit breakers on both SSGR battery banks in the ON (up) position.
2. Turn on the input circuit breaker located on the rear panel of the UPS inverter module.
3. Allow 30 to 45 seconds for the UPS to complete power on self-test.
4. Confirm the UPS display icons for online mode operation. See below.
5. The external output circuit breakers can now be turned on.