INSTALLATION
Check the appliance is electrically safe and gas sound when you have finished.
17
7. Installation
Service and Spares
Firstly, please complete the appliance details below and keep them safe for future reference – this information will enable us
to accurately identify the particular appliance and help us to help you. Filling this in now will save time and inconvenience
if you later have a problem with the appliance. It may also be of benefit to keep your purchase receipt with this leaflet. You
may be required to produce the receipt to validate a warranty field visit.
* This information is on the appliance data badge.
If you Have a Problem
In the unlikely event that you have a problem with your appliance, please refer to rest of this booklet, especially the problem
solving section, first to check that you are using the appliance correctly.
If you are still having difficulty, contact you retailer.
Please Note
If your appliance is outside the 12-month warranty period, our service provider may charge for this visit.
If you request an engineer to visit and the fault is not the responsibility of the manufacture, our service provider reserves
the right to make a charge.
Appointments not kept by you may be subject to a charge.
Out of Warranty
We recommend that our appliances are serviced regularly throughout their life to maintain the best performance and
efficiency. The frequency of service will depend on usage – for normal usage once a year should suffice.
Service work should only be carried out by a suitably Authorised Person.
Spare Parts
To maintain optimum and safe performance, we recommend that only genuine spare parts are used. Do not use re-
conditioned or unauthorised controls. Contact your retailer.
Retailer’s Name and Address
Andi-Co Appliance Pty Ltd.
1 Stamford Road,
Oakleigh,
VIC 3166
Tel: (03) 1300 650 020
Fax: (03) 9569 1450
Email: Service@andico.com.au
Name of Appliance
Classic/Toledo 90 Dual Fuel
Appliance Serial Number*
Fuel Type
Dual Fuel
Date of Purchase
Installer’s Name, Address and
Telephone No.
Date of Installation
Summary of Contents for Toledo 90 Dual Fuel
Page 38: ...36 Notes...
Page 39: ...37 Notes...