60
Traffic-Control
EN
Program 3
Fig. 8: DIP configuration Program 3
This program contains two complete bus stops as well as four further pos-
sible ways of switching the outputs for a predefined period of time, depen-
ding on an input signal. Programs 1 to 4 merely differ as to the diverse
activation periods used.
Possible use
Bus stop 1
Bus stop 2
X 1
X 2
X 3
X 4
Sensor at
input
E1
E2
E3
E4
E5
E6
E7
E8
activates
ST
AB
ST
AB
K
K
K
K
at output
A1
A2
A3
A4
A5
A6
A7
A8
for the
period of
Poti 1 1 s
20 s
1 s
Poti 2 1 s
5 s
10 s
Table 8: Program 3
X
Set the DIP as required, see Fig. 8.
X
Connect the components, see Table 8.
X
If necessary, set the desired period using the potentiometers.