29
N4 INSTRUCTIONS FOR BUILT IN UNIT ASSEMBLY
Phase 1 (fig. B1)
- Drill the holes for built-in assembly. See attached drawings.
- Take off the metal filters.
- Take off the bottom assembly by unscrewing the 4 self-threading screws (A) located inside
the motor chamber.
Phase 2 (fig. B2)
- Insert the built in unit between the cabinets from underneath, and attach it using the supplied
8 self-threading screws for wood (B) into the pre-drilled holes.
- Re-assemble the bottom assembly by screwing in the 4 self-threading screws (A).
The springs (M) allow the unit to temporarily hook onto the wall unit’s panel.
Phase 3 (fig. B3)
- With the exhaust version, connect the output fittings of the motor to the external air dischar-
ge outlet.
- Re-assemble the metal filters on the hood.
- Set up the electric connection only once the electric power supply has been cut off.
N5 INSTRUCTIONS FOR MILLENIUM HOOD ASSEMBLY
Phase 1
- Place the support bar (A-fig. M1) on the wall at the same height as the cooker, at the distance
resulting from the sum of the heights X+415 mm.
- With a spirit level, verify the horizontal alignment and mark 2 points where holes will be
drilled at the ends of the bar.
- Drill the holes, insert 2 8mm expansion bolts and fasten the bar with the relative screws.
Phase 2
- Take the exhaust panel off of the outer edge and the metal filters.
- Hook the hood onto the support bar (fig. M2). Adjust the alignment of the hood, using the
fixing screws. The top screw (B) adjusts the distance from the wall, the lower one (C) adjusts
vertical movement.
Phase 3
- To prevent the hood from falling due to pressure below, fasten it to the wall with an expansion
plug and relative screw using the appropriate holes on the back of the hood (fig. M3).
- With the exhaust version, connect the output fitting of the fan to the external air outlet using
suitable piping.
- Set up the electric connection only once the electric power supply to the hood has been cut
off.
Phase 4 (optional) (fig. M4)
- Place extension (H) in the flue (G) and fasten this assembly to the body of the hood using the
8 screws (V2).
- Slide the extension (H) until it is positioned at the desired height.
- Once you have found the best position place the bracket (L) on the wall, verify the horizontal
alignment with a spirit level and mark 2 drilling points at the ends.
- Drill the holes, insert n. 2 expansion bolts of 4mm ø and fasten the bracket (L) with the relative
screws.
- Tighten the extension (H) to the bracket (L) using screws (M).
Phase 5
- Re-assemble the metal filters and the outer exhaust panels on the hood.
- Power the hood in accordance with regulations in force (sec. D).
English
Summary of Contents for VULCANO
Page 2: ...1 X Y 320 mm A B C SUCTION MODE Fig 1 Fig 2 RECIRCULATION MODE MERCURIO ARTEMIDE VULCANO...
Page 3: ...2 Fig 3 Fig 4 L M G V1 M H MERCURIO ARTEMIDE VULCANO...
Page 4: ...3 05 06 MINERVA AFRODITE X 65cm L M M 8mm G 1 2...
Page 5: ...4 07 08 MINERVA AFRODITE G H H 2 1 3 4 5 L M M 4mm x2...
Page 6: ...5 3 09 10 1 2 8 V1 C 11 C B G 12 x cm D V3 PULSAR ISLAND...
Page 7: ...6 13 2 1 3 PULSAR ISLAND...
Page 9: ...8 W05 W06 W07 W08 B V3 V3 G V2 1 V2 PULSAR WALL...
Page 10: ...9 BUILT IN 50...
Page 11: ...10 BUILT IN 70...