Fanaway LED EVO1 Installation Instructions
3 |
P a g e
V e r 1 . 1
1
Mounting bracket x 1
10
Retraction mechanism x 1
2
Canopy screws x 4
11
Lamp base x 1
3
Canopy x 1
12
LED board x 1
4
Down rod x 1
13
Lamp shade x 1
5
Bolt x 1
14
Wooden screws x 2
6
Bolt & pin cover x 1
15
Plastic anchor x 1
7
Pin x 1
16
Balance tapes x 4
8
Top housing x 1
17
Wall switch x 1 set
9
Blades x 4
INSTALLING THE FAN
TOOLS REQUIRED:
-
Phillips / flat head screwdriver
-
Pair of pliers
-
Adjustable spanner
-
Step ladder
-
Wire cutter
-
Wiring, supply cable as required by local provincial and national wiring codes and regulations.
INSTALLING THE MOUNTING BRACKET
The ceiling fan must be installed in a location so that the blades are 300mm spacing from the tip of the blade to the
nearest objects or walls.
Secure the hanging bracket to the ceiling joist or structure that is capable of carrying a load of at least 45kg, with two
long screws provided. Ensure at least 30mm of the screw is threaded into the support.
NOTE: The bracket screws provided are for use with wooden structures only. For structures other than wood,
the appropriate screw type MUST be used.
Fig. 2