- 4 -
1. Disconnect the power supply.
2. Mount relay in the flush-mounted box.
3. Connect the power supply cables to PWR group: phase L-wire
to terminal 4 and neutral N-wire to terminal 2 or 3.
4. Momentary switches connected in parallel connect to terminal
1 and phase L-wire.
5. Powered receiver of R1 section connect in series to terminal
6, and powered receiver of R2 section connect in series to
terminal 5.
6. Set the required program (sequence) with the potentiometer.
1 control input
3 N power supply
4 L power supply
5 output – R1 section
6 output – R2 section
Mounting
Wiring diagram
Summary of Contents for BIS-409
Page 7: ......