background image

- 4 -

1. Disconnect the power supply.

2. Mount relay in the flush-mounted box.

3. Connect the power supply cables to PWR group: phase L-wire 

to terminal 4 and neutral N-wire to terminal 2 or 3.

4. Momentary switches connected in parallel connect to terminal 

1 and phase L-wire.

5. Powered receiver of R1 section connect in series to terminal 

6, and powered receiver of R2 section connect in series to 

terminal 5.

6. Set the required program (sequence) with the potentiometer.

 

1  control input

 

3  N power supply

 

4  L power supply

 

5  output – R1 section

 

6  output – R2 section

Mounting

Wiring diagram

Summary of Contents for BIS-409

Page 1: ...her state after sub sequent pulse from control button R1 and R2 contact activation is indicated by the relevant R1 and R2 red LED After a power failure state of the contact is reset When the power is back on the relay starts from the sequence number 0 Purpose Functioning F F Filipowski sp j Konstantynowska 79 81 95 200 Pabianice POLAND phone fax 48 42 215 23 83 48 42 227 09 71 www fif com pl e mai...

Page 2: ...2 3 Pressing the button again after more than 5 seconds opens both contacts sequence 0 A long press of the button in any sequence opens both contacts sequence 0 After switching off both relays pressing the button again re stores the state from before switching off state memory This does not apply to relay power failure Work functions ...

Page 3: ...nces 1 2 Pressing the button again aft er more than 5 seconds opens both contacts sequence 0 A long press of the button in any sequence opens both contacts sequence 0 After switching off both relays pressing the button again re stores the state from before switching off state memory This does not apply to relay power failure ...

Page 4: ...4 Momentary switches connected in parallel connect to terminal 1 and phase L wire 5 Powered receiver of R1 section connect in series to terminal 6 and powered receiver of R2 section connect in series to terminal 5 6 Set the required program sequence with the potentiometer 1 control input 3 N power supply 4 L power supply 5 output R1 section 6 output R2 section Mounting Wiring diagram ...

Page 5: ... A control pulse current 1 mA total backlight current control buttons 5 mA activation delay 0 1 0 2 s switch off time adjustable 1 15 min power indication green LED power consumption standby 0 15 W on 0 6 W terminal 2 5mm screw terminals tightening torque 0 4 Nm working temperature 25 50 C dimensions 54 size 48 43 mm h 20 mm mounting in flush mounted box 60 ingress protection IP20 Technical data ...

Page 6: ...F F products are covered by a warranty of the 24 months from the date of purchase Effective only with proof of purchase Contact your dealer or directly with us F F Filipowski sp j declares that the device is in conformity with the essential requirements of The Low Voltage Directive LVD 2014 35 EU and the Electromagnetic Compatibility EMC Directive 2014 30 UE The CE Declaration of Conformity along ...

Page 7: ......

Reviews: