Programming time of enclose
1. Press and hold a button PROG for time when green LED U start to pulsate.
2. When we again press a button PROG (START). Controller start count a time
which is to signal by pulsate of green LED.
3. Press again a button PROG (STOP). Controller remember a counted time.
Programmin mode is automaticly closed ( green LED U shine c
ontinually
).
* If at time 30 sec from start programming mode a count of
time doesn’t to start, then controller will out from
programming mode.
* Max time for programming 10min. Test by long time than 10
min to cause controller automaticly out from programming
mode.
* Input to programming mode posible is only when motor of
roller is OFF.
* In programming mode a controller doesn’t to react for
outward control signal .
Do not install to device which is broken or incomplete.
During assembly of controller should be take special care
Wrong connection could cause to give a shock and/or break
controller or connected device
5. Controlled roller motor connect properly to contacts 3 and 4 and to N.
6. Take ON the power.
7. Programming to time of upwards/downwards of roller.
P
rescribed
is that
programmed time should be longer than 10 sec from real time of
upwards/downwards.
4. Choose control option (control impulse L or N). Switch of local control and
central control connect with marks with function to contact to choosen
cable (accordance with choosen control option - L or N).
3. Connect power cable to contact 1-2 with marks.
Group of controllers which working with common central
control should be supplied from the same phase e.g only L1.
All control inputs of controllers which works separately or in
group should have to common control impulse option - all are
controlling from the same phase, e.g. only L1; or all from N.
Connection different phase e.g.
"zero" N to inputs of control inputs of controller can cause to
wrong work of system and break controllers.
L1 and L2; or phase L and
Choosing control option from phase (L) to control inputs
should be connect to the same phase as for supply e.g. only
phase L1.
Assembly
1. Take OFF the power.
2. Put on the controller on the wall or a roller box.
D170223
supply
230V AC
current load (AC-3)
<2A
control pulse current for L/N
<1mA
power supply indicator
LED green
working temperature
-25
÷
50
°
C
connection
signal
dimensions
power consumption
1W
3×DY 1mm², l=10cm
supply 4×DY 1.5mm², l=10cm
Ø
55, h=20mm
mounting
under plaster box
Ø
60
protection level
IP20
Technical data
- 7 -
- 6 -