background image

Programming time of enclose

1. Press and hold a button PROG for time when green LED  U  start to pulsate.
2. When we again press a button  PROG (START). Controller start count a time 

which is to signal by pulsate of green LED.

3. Press again a button  PROG (STOP). Controller remember  a counted time. 

Programmin mode is automaticly closed ( green LED U shine c

ontinually

).

* If at time 30 sec from start programming mode a count of 

time  doesn’t  to  start,  then  controller  will  out  from 
programming mode.

* Max time for programming 10min. Test by long time than 10 

min to cause controller automaticly out from programming 
mode.

* Input to programming mode posible is only when motor of 

roller is  OFF.

*  In  programming  mode  a  controller  doesn’t  to  react  for 

outward control signal .

Do not install to device  which is  broken or incomplete.

During  assembly  of  controller  should  be  take  special  care 
Wrong connection could cause to give a shock and/or break 
controller or connected device

5. Controlled roller motor connect properly to contacts 3 and 4 and to N.
6. Take ON the power.
7. Programming to time of upwards/downwards of roller.

 

P

rescribed

 is that 

programmed  time  should  be  longer  than  10  sec  from  real  time  of   
upwards/downwards.

4. Choose control option  (control impulse L or N). Switch of local control and 

central control connect with marks with function  to contact to  choosen 
cable (accordance with choosen control option - L or N). 

3. Connect  power cable to contact  1-2 with marks.

Group  of  controllers  which  working  with  common  central 
control should be supplied from the same phase e.g only L1.

All control inputs of controllers which works separately or in 
group should have to common control impulse option -  all are 
controlling from the same phase, e.g. only L1; or all from N. 

Connection  different  phase  e.g. 
"zero" N to inputs of control inputs of controller can cause to 
wrong work of  system and break controllers.

L1  and  L2;  or  phase  L  and 

Choosing  control  option    from  phase  (L)  to  control  inputs 
should be connect to the same phase as for supply   e.g. only 
phase  L1. 

Assembly

1. Take OFF the power.
2. Put on the controller on the wall  or a  roller  box.

D170223

supply

230V AC

current load (AC-3)

<2A

control pulse current for L/N

<1mA

power supply indicator

LED green

working temperature

-25

÷

50

°

C

connection

signal

dimensions

power consumption

1W

 3×DY 1mm², l=10cm

supply 4×DY 1.5mm², l=10cm

Ø

55, h=20mm

mounting

under plaster box 

Ø

60

protection level

IP20

Technical data

- 7 -

- 6 -

Reviews: