8
5.
Reinstall the hanger ball on the downrod as
follows. Route the 80 in. wires through the hanger
ball. Position the pin through the two holes in the
downrod and align the hanger ball so the pin is
captured in the groove in the top of the hanger
ball. Pull the hanger ball up tight against the
pin. Securely tighten the set screw in the hanger
ball. A loose set screw could create fan wobble.
(Figure 5)
6.
Cut off excess lead wire approximately 6 to 9
inches above top of the downrod. Strip
1/2 inch from the end of each lead
insulation off
wire. (Figure 6)
7.
Completely remove one of each right-hand screw
on either side of the flap of the hanger bracket and
retain the screws for later. Loosen the remaining
screws without fully removing them. (Figure 7)
How to Assemble Your Ceiling Fan (Downrod)-continued
NOTE:
All set screws must be checked, and
retightened where necessary, before installation.
Figure 4
Figure 6
Figure 7
Canopy
Canopy Trim Ring
Assembly
Motor Coupling
Cover Assembly
4.
Route the 80 in. wires through canopy trim ring
assembly, motor coupling cover assembly and
ceiling canopy. (Figure 4)
Figure 5
Standard Hanger Ball
Sloped Hanger Ball