background image

10983 Bennett Parkway

Zionsville, IN 46077

(888) 567-2055

FAX (866) 482-5215

Outside U.S. call (317) 733-4113

Visit Our Website www.fanimation.com

1.

 Assemble two (provided) Threaded 

Rods on the Crossbar. (Figure 1)

2.

 Mount assembled Crossbar to 

junction box with screws (provided 

with your junction box) (Figure 2).

3.

 Securely connect the bare copper 

(Ground)  wire to the (hex-head) 

screw located on the Crossbar. 

Securely connect the white lamp 

wire to the white supply (neutral) 

wire using wire nut supplied.  

Securely connect the black lamp 

wire wire to the black supply (hot) 

wire using wire nut supplied.

(Figure 3)

5.

 Carefully fasten hex nut onto 

the threaded rod while supporting 

Rubber Washer and Glass Bowl 

(sold seperately), do not over 

tighten. (Figure 5)

Copyright 2004 Fanimation

Figure 1

Figure 2

Figure 3

Figure 6

Figure 5

Figure 4

4.

 After connections have been 

made, carefully push leads into the 

outlet box.  Carefully fasten the 

Fixture over the Threaded Rods 

with the Lockwashers and Knurled 

Nuts provided. Install light bulbs (not 

included, 60 watt max each).

(Figure 4)

NOTE: 

Be sure that the electrical 

wires are completely inside the 

junction box and not pinched 

7.

 You have now completed the 

assembly of your Semi Flush ighting 

fixture.  Restore power and operate 

your light fixture with your standard 

on/off light switch.

6.

 Fasten Bowl Cap onto the 

threaded rod with Finial Nut.

2004/12

Reviews: