4. ASSEMBLING & OPERATING INSTRUCTIONS
4. ASSEMBLING & OPERATING INSTRUCTIONS
1. Mark out corresponding holes on the wall as per the mounting bracket on the
back of the heater.
All 4 holes must be marked & drilled.
2.
Use an 8mm drill bit to make the holes in the wall, minimum 35mm depth. Please
use the correct drill bit for the wall material you are drilling into.