16
Minimize turning angle and length of run between
pile and trailer to increase loading efficiency. Also,
place load evenly or centered in the attachment.
WARNING
Carry the load no higher than necessary to clear the terrain. Turn
and brake slowly. Always be sure that loading area is level and
on solid ground. Do not raise loader higher then required while
dumping. Immediately lower the loader to ground if the tractor
becomes unstable.
Operation - 2895 Loader
Leave material, which drifts over the bucket sides
for final cleanup.
Backfilling or Scraping
For forward back filling, approach pile with a level
bucket. Utilize the float position to minimize bucket
cutting edge wear. Leave dirt in bucket. Dumping
on each pass reduces efficiency.
Note: Use leveling rod for a guide to ensure bucket
is level.
Do not use bucket in dumped position for forward
grading. This will only impose severe shock loading
on the bucket cylinders and it is difficult to maintain
a level grade.
Summary of Contents for Allied 2895
Page 1: ...Operator and Parts Manual 122011 P4110 2895 Loader For serial numbers 0528950045 and later ...
Page 2: ......
Page 6: ...6 Specifications 2895 Loader Specifications ...
Page 31: ......
Page 36: ...36 Parts 2895 Loader Main Frame Assembly ...
Page 38: ...38 Parts 2895 Loader Hydraulic Plumbing Assembly ...
Page 40: ...40 Parts 2895 Loader Main Frame Assembly TSL ...
Page 42: ...42 Parts 2895 Loader Hydraulic Plumbing Assembly TSL ...
Page 49: ......