23
Operation - 2895 Loader
2. Lower attachment level to the ground while
engaging float position. Ensure attachment
rests firmly on ground with minimal downward
pressure. If required extend bucket cylinders
to rotate upright rearward. At this stage the pin
should have no pressure. Set tractor park brake
and remove loader lock pins. Check hydraulic
hoses such that they will not get pinched or
stretched during removal.
CAUTION
Shut tractor off and store parking stands within loader cross tube
remembering to stand on the outside of the loader arms. Start
the tractor and continue to cycle loader and attachment to verify
loader operation.
3. Retract bucket cylinders to raise upright and
disengage from the loader mount cradle. If
additional clearance is required, extend lift
cylinders while slowly backing the tractor away
from the loader.
4. After the tractor is clear of the loader, retract all
cylinders to protect the shafting. Shut tractor
off and set park brake and relieve oil pressure
in hoses by moving valve control. Disconnect
hydraulic loader hydraulic hoses at the quick
couplers.
Important: Cap both male and female couplers.
Wrap loader hoses over loader arm.
Summary of Contents for Allied 2895
Page 1: ...Operator and Parts Manual 122011 P4110 2895 Loader For serial numbers 0528950045 and later ...
Page 2: ......
Page 6: ...6 Specifications 2895 Loader Specifications ...
Page 31: ......
Page 36: ...36 Parts 2895 Loader Main Frame Assembly ...
Page 38: ...38 Parts 2895 Loader Hydraulic Plumbing Assembly ...
Page 40: ...40 Parts 2895 Loader Main Frame Assembly TSL ...
Page 42: ...42 Parts 2895 Loader Hydraulic Plumbing Assembly TSL ...
Page 49: ......