Operation - RT17, RT19 Tedder
28
Reducing The PTO Driveline Length
Stop the engine and leave the operator’s position
(See “Leaving The Operator’s Position” in the
Operation section). Make sure the PTO driveline and
all rotating components have come to a complete
stop before leaving the operator’s position.
WARNING
AVOID INJURY OR DEATH
•
Do NOT exceed the rated implement PTO speed.
•
Stay clear of rotating driveline.
•
Keep bystanders away.
•
Keep hands, feet, clothing and long hair away.
•
Keep PTO shields and all guards in place.
•
Disengage PTO, move the tractor controls to
the Neutral position, stop the engine and make
sure all rotating components are stopped before
leaving the operator’s position.
•
Do NOT service the tractor or implement with
the PTO engaged.
•
Do NOT service the implement in a raised
position unless properly blocked and with all
rotating components stopped.
•
Disengage PTO for road travel.
Remove the PTO driveline from the tractor and
place in storage position (if equipped).
Enter the operator’s position (See “Entering The
Operator’s Position” in the Operation section).
Start the engine.
Raise or lower the three-point implement to get
the shortest distance between the tractor PTO shaft
and three-point implement gearbox PTO shaft.
Stop the engine and leave the operator’s position.
Pull the PTO driveline apart and reinstall each
individual section; one half to the tractor PTO shaft
and one half to the implement gearbox PTO shaft.
Figure 8
1. Hold PTO driveline sections parallel to one another
and measure back 2 in. (50.8 mm) (Item 1)
[Figure
8]
from the yoke of each section and place mark on
opposite section. Cut the plastic shield at this length
(Item 2)
[Figure 8].
Figure 9
2. Using the plastic guard lengths that were cut off in
[Figure 8]
, align the cut off lengths (Item 1)
[Figure
9]
with the end of the inner & outer shafts. Place a
mark (Item 2)
[Figure 9]
on the inner & outer shafts
and cut the inner & outer shafts off at this length.
3. Round off all sharp edges and deburr.
4. Thoroughly grease and install the PTO driveline
halves together.
5. Recheck for proper operation.
TRACTOR
PTO SHAFT
TRACTOR
PTO SHAFT
IMPLEMENT
PTO SHAFT
IMPLEMENT
PTO SHAFT
2
2
2
1
1
2
1
Summary of Contents for RT17
Page 1: ...092018 R0002 OPERATOR AND PARTS MANUAL Tedder Model RT17 RT19 ...
Page 2: ......
Page 6: ...Warranty Registration Form RT17 RT19Tedder 4 ...
Page 8: ...Introduction RT17 RT19Tedder 6 ...
Page 12: ...Introduction RT17 RT19Tedder 10 ...
Page 14: ...Safety RT17 RT19Tedder 12 ...
Page 20: ...Safety RT17 RT19Tedder 18 Equipment and Safety Decals GREASE POINT ...
Page 22: ...Safety RT17 RT19Tedder 20 ...
Page 24: ...Operation RT17 RT19Tedder 22 ...
Page 40: ...Maintenance RT17 RT19Tedder 38 ...
Page 46: ...Maintenance RT17 RT19Tedder 44 ...
Page 48: ...Parts Identification RT17 RT19Tedder 46 ...
Page 58: ...Parts Identification RT17 RT19Tedder 56 Pull Type Mechanical Angle Adjust Release Rope ...
Page 60: ...Parts Identification RT17 RT19Tedder 58 Pull Type Hydraulic Angle Adjust ...
Page 62: ...Parts Identification RT17 RT19Tedder 60 Mounted Type Guards ...
Page 64: ...Parts Identification RT17 RT19Tedder 62 Mounted Type Hitch PTO Release Rope ...
Page 66: ...Parts Identification RT17 RT19Tedder 64 Mounted Type Hydraulic Hoses Stabilizer Bars ...
Page 72: ...Parts Identification RT17 RT19Tedder 70 ...
Page 74: ...Specifications And Shipping Kit Numbers RT17 RT19Tedder 72 ...
Page 78: ...Specifications And Shipping Kit Numbers RT17 RT19Tedder 76 ...
Page 80: ...Warranty RT17 RT19Tedder 78 ...
Page 83: ......