User Manual, FD20 v2.3
Version 1.2
– December 2021
53
8.2 Preventive Maintenance Checks on the Tools
The table below contains the service and maintenance intervals recommended for the tools.
Always make sure to follow the guidelines when performing maintenance work. If in doubt, please contact
your local distributor for advice before commencing the service/maintenance task.
Always remember to follow the safety instructions when performing inspections or maintenance and
service work on the Robot. Always set the Robot to manual operation and then turn off both power sources
before entering the Robot.
If the backlash is more than 1mm at any of the
connecting points, replace the bushings in the
connection rod.
Thorough check of the
entire Robot
Perform a thorough inspection of the entire
robot once a year.
Check for loose bolts/nuts, cable conditions,
bushings etc.
This should be performed by an authorized
distributor
Task
Type
Daily
W
ee
kly
Mon
th
ly
Y
ea
rly
Comments
Check for general
damage on the tools.
Visual
check
Replace parts if necessary.
Check for unusual noise
from the Sowing system
or weeding motors
Auditory
check
In case of errors contact your local distributor.
Check seed sensor
contamination.
Visual
check
Check all light sensors via the HMI screen
.
This is a good way to check if a sensor is
unusually dirty and thereby prevent unintended
stops during the sowing period by proactively
cleaning the sensors.
Only use compressed air or soft cloth to clean
the sensors as they are very sensitive to
mechanical damage.
Check for backlash in
the trailer supports.
Visual
check
When the tools are lifted, push sideways, back
and forth on each of the trailer arms. The
backlash should be visible if present. Check
both ends of the connecting rods for abnormal
backlash.
If the backlash is more than 1mm at any of the
connecting points, replace the bushings in the
connecting rod and the trailer connection point.
Check roller disc
bearings
Visual
check
Check the roller disc bearings for unusual wear
and verify that all discs are spinning freely.
Summary of Contents for FD20
Page 1: ...FARMDROID FD20 v2 3 ORIGINAL USER MANUAL Version 1 2 Effective from December 2021 ...
Page 7: ...User Manual FD20 v2 3 Version 1 2 December 2021 4 1 3 EU Declaration of Conformity ...
Page 10: ...User Manual FD20 v2 3 Version 1 2 December 2021 7 ...
Page 69: ...User Manual FD20 v2 3 Version 1 2 December 2021 B Operator Panel Schematics ...
Page 70: ...User Manual FD20 v2 3 Version 1 2 December 2021 C Wire harness Main Tube connections ...
Page 71: ...User Manual FD20 v2 3 Version 1 2 December 2021 D Wire harness Secondary Tube connections ...
Page 72: ...User Manual FD20 v2 3 Version 1 2 December 2021 E Wire harness Wire Connections ...