13
POLY BUILDINGS
Revision date: 03.15.12
FINAL FRAME CHECK
1. Return to the frame connections and verify that all bolts
are tight.
2. Verify that each purlin splice is secured with a Tek
screw.
3. Verify that each purlin is secured to the end clamp and
cross connector and that each cross connector and
end clamp is secured to the rafter. See diagram below.
4. Inspect the frame for sharp areas that could damage
the cover. If found, file smooth and cover with layers of
duct tape to protect the cover.
5. Verify that all bolts are positioned with the heads to the
outside of the frame. Tape the bolts and rafter joints
before
installing the cover.
6. Continue by installing the main cover.
Cross Connector
to Rafter Tek
Screw
Purlin to Cross
Connector Tek
Screw
Rafter
Purlin
ATTENTION:
Rafter
shown may differ
from the actual
rafter. Steps to
secure the purlin to
the connector and
the connector to the
rafter are the same.
Position the Tek
screws so they will
not touch the cover
once it is installed.
Space below is reserved for customer notes.