GROWSPAN
™
ROUND PRO GREENHOUSES AND SYSTEMS
16
Revision date: 06.27.18
END WALL INSTALLATION (continued)
4. Secure the base tube between the legs of the end
rafter using an angle bracket and Tek screws.
5. On the base tube surface facing the inside of the
greenhouse, install a short Tek screw at each joint and
then locate and mark the center of the base tube.
6. Consult the End frame diagram (Quick Start section)
and mark the rough opening for the width of the double
door assembly.
7. Place five (5) band clamps on end rafter above the
door as shown below.
DO NOT TIGHTEN THE BOLTS
AT THIS TIME.
8. Select the tubing for the two vertical frame supports for
the sides of the double door. Each support includes:
• Square tubing (#102897 swaged end): For the
longer vertical frame members, shorter sections of
tube may need to be cut and added.
• One (1) square-to-round tube bracket (#104074)
9. Measure the distance
between the top of the base tube
and band clamp (Step 7)
to determine the length of the
first vertical section of the door frame tube.
10. Choose one square tube (#102897), insert the swaged
end of the long tube into the plain end of another tube
and tap with a hammer to properly seat the tubes at the
joint.
11. On this assembled frame member, mark the length
determined in Step 9 (above) and
subtract the amount
needed to account for the square-to-round tube
connect bracket
, which is attached to the top of the
frame tube. See the diagram that follows.
12. Select a square-to-round tube connect bracket and
attach the bracket to one end of the vertical frame
member. Use a 5/16" drill bit to drill a hole through the
tube and attach the bracket to the tube using a nut and
carriage bolt.
13. Repeat Steps 9-12 for the remaining vertical frame
member for the door.
14. With the square-to-round tube connect bracket
attached to the top of each vertical door frame tube,
use the bolt in the band clamp to attach the bracket to
the band clamp. DO NOT TIGHTEN AT THIS TIME.
NOTE:
The heads of the bolts for each clamp are to the
outside (or front/back) of the greenhouse. At this point,
the two vertical door frame members should be loosely
attached to the end rafter assembly.
End Rafter
Square-to-
Round Tube
Connect
Bracket
Front (or outside)
of the greenhouse
Vertical Door
Frame Tube
The bracket
shown in this
diagram can
be installed
with either its
short section
(as shown) or
the long section
attached to the
ground post.
Base Tube
Ground
Post
ATTENTION:
Some diagrams may shown only three
(3) band clamps; end wall has been redesigned to
include five (5) band clamps above the door opening.
See End Wall diagrams in Quick Start Guide near the
back of this manual.