25
GROWSPAN
™
ROUND PRO GREENHOUSES AND SYSTEMS
Revision date: 06.27.18
MAIN COVER INSTALLATION
After the end panels and doors are installed, install the
main covers. The steps to install the cover include:
1. Attach poly latch U-Channel along the greenhouse
sides and tops of the greenhouse
end rafters
.
2. Pull one cover film over the frame and attach to the end
rafters.
3. Stretch and attach the first cover to the sides.
4. Install the Inflation Fan kit.
5. Attach a second cover layer to the frame.
6. Test the operation of the Inflation fan kit.
7. Install roll-up side kits and test.
Space below is reserved for customer notes.
NOTE:
This length of end cap will act as a stop for the
remaining door of the double door when both doors are
closed.
12. Check operation of the latches and doors.
13. Continue with
Main Cover Installation
procedure that
follows.
11. Next, install another section of end cap on the
inside
frame of the door that includes the chain latch.
DOUBLE DOOR ASSEMBLY (continued)