20
20
Revision date: 12.23.15
Upper Connecting Pipes—Between the Tanks
Install the plumbing between the tanks.
1. Set the tank frames in position using the layout diagram as a
guide. See page 5. When filled, tanks are heavy! Position all
tank frames on a level, solid surface.
Level all tanks before
filling with water.
Once plumbed, these tanks cannot be moved.
Exceeding the space-between-tanks dimensions may require
additional pvc tubing and fittings.
2. Set the tanks in the tank frames and align the tank holes to
install the between-the-tank pipes. Examine the tanks and install
according to the positions shown in the diagrams.
3. Align the holes of the different tanks. After setting tanks in the
frames, verify they are level. Tubing between the larger fish-
holding tanks is 1-1/2"; overflow tubing between the smaller filter
and mineralization tanks is 1". Verify fittings and tubing size on the
diagrams before you cut and glue connections.
9c
WF4140
(1-1/2" PVC)
WF4135
1" overflow
tube
IMPORTANT:
All pvc assemblies
between the
tanks
must be level! After installing these, position
a level between the tanks and adjust frames as
needed. See the diagram.
SIDE VIEW
END VIEW
55A
15A
15B
55A
1-1/2" PVC
w/ 112285
Coupling
1" PVC
FLOA
T BED
SIDE VIEW
END
VIEW