9
POLY BUILDINGS
Revision date: 03.15.12
RAFTER ASSEMBLY (CONTINUED)
View below shows how to position all end clamps to
prepare for the frame assembly. Purlin pipe shown is
installed during the frame assembly procedure.
3.
Repeat the same procedure for the final end rafter.
4. Continue with the FRAME ASSEMBLY instructions that
follow.
Space below is reserved for customer notes.
Toward the inside
of the frame when
assembled.
#102857
End Rafter
Purlin