background image

Visit 

www.ClearSpan.com

 for additional products and customer assistance.

CLEARVIEW

 PANELS

PREPARE THE FRAME AND HANG THE PANEL 

Gather the Tools and Materials

Screw Hooks
Eye Screws 
Drill bit
Variable speed drill




With the help of an assistant, hold the panel centered 

on the outside of the opening high enough that the 

bottom of the panel does not touch the ground or floor. 

 

NOTE:

 To prevent wear do not let the panel touch the 

ground or floor.
Mark the frame where each grommet will be located. 
Draw a straight line between the first and last marks on 

the frame. This assures the panel hangs straight and 

does not sag in the middle.
Drill pilot holes along the straight line and insert screw 

hooks into the frame at each mark for a grommet. 
Drive the screw hooks into the frame to the same depth 

so the panel will hang evenly. Turn the open side of the 

hooks upward.

1.

2.
3.

4.

5.

Hang the panel on the screw hooks by slipping the 

grommets over the open end of the hooks.

6.

INSTALL THE ROLL-UP COMPONENTS

 

 

Gather the Tools and Materials

Pulleys
Rope Cleat
Nylon Cord
Drill bit
Variable speed drill





Slip a 7/8'' nylon pulley on the second screw hook from 

each end of the panel. Attach additional pulleys to the 

screw hooks along the panel no more than 72'' apart.

1.

Attach a rope cleat to the outside of the frame about 

five (5) feet above the ground where it is convenient to 

reach. The cord to roll up and unroll the panel will be 

attached to this cleat.

3.

Drill pilot holes and insert eye screws 

inside

 the frame 

opposite each screw hook with a pulley.

2.

Summary of Contents for ClearView

Page 1: ...rohibited without permission Revision date November 2006rp ClearView Panels STK DESCRIPTION 105659 16 Mil 3 Finished Sides with Grommets 1 Hem Side 10565920 20 Mil 3 Finished Sides with Grommets 1 Hem...

Page 2: ...and will void all warranty and protection the owner is entitled The steps outlining the assembly process are as follows Verify that all parts are included in the shipment Notify Customer Service for q...

Page 3: ...other machinery for lifting designed to work safely at the height of the panel UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin Unpack...

Page 4: ...ng the panel Install the roll up components Panel operation 1 2 3 4 5 CC4595 Snugger Tie Down FAMF01 Fender Washer FAX115 Screw Hook CC5505 Nylon Cord AS5020 7 8 Nylon Pulley FA1980 Eye Screw AS2080 R...

Page 5: ...t lengths may have been sent Select the lengths that best match the length of each panel before cutting any pipes Some pipes have swaged ends do not cut these ends off Assemble the conduit by insertin...

Page 6: ...ne and insert screw hooks into the frame at each mark for a grommet Drive the screw hooks into the frame to the same depth so the panel will hang evenly Turn the open side of the hooks upward 1 2 3 4...

Page 7: ...the screw hooks to the rope cleat 6 Extend the cord about a foot past the rope cleat and cut it 7 Run the cord down the back of the panel under the bottom of the panel up the front of the panel and th...

Page 8: ...ELS Run each cord down the back of the panel under the panel up the front of the panel through the pulley and through any screw hooks to the rope cleat 9 Run all the cords through the last screw hook...

Page 9: ...e a non corrosive wood or decking screw with a non corrosive flat washer 4 CARE AND MAINTENANCE Your ClearView panel will provide years of trouble free service To protect your investment follow the ti...

Reviews: