55
Revision date: 12.02.16
2. Take cover material and position it along the base of one side of the building.
3. Unfold cover and locate edge. Verify that the width and length are properly oriented with the width and length of
the building.
ATTENTION:
Measure cover material and compare it to the over-the-top measurement of your building
before installation and cutting!
Consult the diagram in the Quick Start section near the end of this guide for the
over-the-top measurement.
WEAR EYE
PROTECTION
WHEN
INSTALLING
SPRING WIRE!
Film Cover Installation
4. Along the edge, clamp self-locking, duck-billed pliers to the cover material and tie ropes or straps to the pliers.
NOTE:
The ropes or straps must reach over top of building to the other side. Number of ropes depends on building
OHQJWKXVHDGGLWLRQDOURSHVVSDFHGHYHQWKURXJKRXWOHQJWKWRSUHYHQWWHDULQJFRYHUZKHQLWLVSXOOHGLQWRSODFH