57
Revision date: 12.02.16
Film Cover Installation
6. Have assistants pull the cover end-to-end and square the cover on the frame. Working from inside the frame on
a lift, secure cover to the vent frame using the 102198 spring wire. See dashed line below. Allow a few inches of
material to extend past the 111613Z144.
NOTE:
Small photo shows spring wire installed in the 111613Z144. Above, assistants are shown standing in a lift
inside the building securing the cover to the ridge vent frame.
Step 6
End Panel
Cover Panel A
Cover Panel B
Step 4: Pull cover up to this point.
Step 5: Secure to edge of vent.
Step 6
WEAR EYE
PROTECTION
WHEN
INSTALLING
SPRING WIRE!