64
Revision date: 12.02.16
Curtain Stabilizer Bar Installation
The curtain stabilizer bar secures the lower end of the roll-up side panel when it is closed (or down). It is installed just
above the baseboard attached to the frame and ground level. Secure the stabilizer bar to each ground post using an
FA4482 Tek screw.
This component is not used when buildings are equipped with the dropdown side option.
&857$,167$%,/,=(5%$5,167$//$7,21²=
Continue with the installation of the roll-up side panels.