GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
16
113836_37_38_39R Revision date: 06.06.18
4. Secure base tube using an angle bracket and FA4482B
Tek screws at each end.
INSTALL THE END WALL FRAME (continued)
The bracket
shown in this
diagram can
be installed
with either its
short section
(as shown) or
the long section
attached to the
ground post.
Base Tube
Ground
Post
5. On the base tube surface facing the inside of the
greenhouse, install an FA4482B Tek screw at each pipe
joint. Next, locate and mark the center of base tube.
6. Consult the end frame diagram (Quick Start section)
and
mark the rough opening for the double door
.
7. Place band clamps on end rafter above the door as
shown below.
DO NOT TIGHTEN THE BOLTS AT
THIS TIME.
ATTENTION:
Consult the diagrams in the Quick Start
section to view the frame for this shelter.
8. Next, consult end frame diagram in Quick Start section.
Choose one (1) square tube (#102897) and insert the
swaged end into a 104779 tube.
9. Measure the required length for the frame tube.
NOTE:
Length is measured
between top of base tube
and band clamp (Step 7)
on rafter.
10. On assembled frame member, mark length determined
in Step 9 and
subtract amount needed to account
for square-to-round tube connect bracket,
which will
be attached to top of frame tube. See diagram below.
11. Cut the tube to length.
12. Select a 104074 square-to-round tube bracket and
attach bracket to one end of frame member. Use a
5/16" drill bit to drill a hole through tube. Attach bracket
to tube using a FALB32B nut and FAH320B bolt.
13. Repeat Steps 8-12 to construct the remaining vertical
frame tube for the door.
14. Install the frame tubes. Use the bolt in the band clamp
to attach the bracket to the band clamp. DO NOT
TIGHTEN AT THIS TIME.
NOTE:
The heads of the bolts for each clamp are to the
outside (or front/back) of the greenhouse. At this point,
the two vertical door frame members should be loosely
attached to the end rafter.
End Rafter
Square-to-
Round Tube
Connect
Bracket–
104074
Front (or outside)
of the greenhouse
Vertical Door
Frame Tube
FAH320 Bolt &
FALB32B Nut
Finished Grade